Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 22: Line 22:
   
 
===== SUSS MA6 =====
 
===== SUSS MA6 =====
The system is down. The vendor is coming to PM the system and look at the lamp power supply.
+
The system is down. The vendor is coming to PM the system and look at the lamp power supply. The system should be ready to use by 5 pm.
 
[[User:Silva|Silva]] 09:25, 5 February 2019 (PST)
 
[[User:Silva|Silva]] 09:25, 5 February 2019 (PST)
   

Revision as of 10:25, 5 February 2019

Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)

ALD Metal Dep

The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)

SUSS MA6

The system is down. The vendor is coming to PM the system and look at the lamp power supply. The system should be ready to use by 5 pm. Silva 09:25, 5 February 2019 (PST)