Revision as of 11:44, 4 February 2019
Equipment Status
Suss Bonder
The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)
KLA Tencor Surfscan
The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)
ALD Metal Dep
The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)