Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(gasnoics down)
m (sig)
Line 14: Line 14:
 
<!------------- Announcements ---------------->
 
<!------------- Announcements ---------------->
 
===== Announcements =====
 
===== Announcements =====
There are no general announcements at this time.
+
There are no general announcements at this time.
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
+
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
   
 
===== Gasonics Down =====
 
===== Gasonics Down =====
Check email for updates
+
Check email for updates.
[[User:John d|John d]] ([[User talk:John d|talk]]) 10:14, 12 February 2018 (PST)
+
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
   
 
===== ASML Up =====
 
===== ASML Up =====
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
+
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
+
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
   
 
===== JEOL SEM #2 =====
 
===== JEOL SEM #2 =====
Problem with load lock gate valve. Currently down.
+
Problem with load lock gate valve. Currently down.
// [[User:John d|Posted:]] 15:40, 8 February 2018 (PST)
+
// [[User:John d|Posted:]] 15:40, 8 February 2018 (PST)
   
 
===== Cary 500 =====
 
===== Cary 500 =====
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector.
+
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector.
// [[User:John d|Posted:]] 15:06, 7 December 2017 (PST)
+
// [[User:John d|Posted:]] 15:06, 7 December 2017 (PST)
   
 
<!---------- end of announcements ------------>
 
<!---------- end of announcements ------------>

Revision as of 11:15, 12 February 2018

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time.

// Posted:  09:58, 4 January 2018 (PST)
Gasonics Down

Check email for updates.

// Posted: 10:14, 12 February 2018 (PST) 
ASML Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use.

// Posted: 18:52, 10 February 2018 (PST)
JEOL SEM #2

Problem with load lock gate valve. Currently down.

// Posted:  15:40, 8 February 2018 (PST)
Cary 500

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector.

// Posted: 15:06, 7 December 2017 (PST)