Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML Dec 12th Laser PM)
 
(92 intermediate revisions by 5 users not shown)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== Lab Closure: Friday + Saturday nights =====
+
===== MA6: service 11/30 =====
The cleanroom will be closed Friday night, April 22 from 10pm until Saturday morning at 4am. The lab will also be closed Saturday night, April 23 from 10pm until Sunday morning at 4am for floor cleaning. Please plan your process accordingly.  
+
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed.
// [[User:John d|John d]] 11:51, 19 April 2022 (PDT)
+
// [[User:John d|John d]] 08:26, 20 November 2022 (PST)
  
===== LEXT Confocal: DOWN =====
+
===== ASML: Down on Dec 12th =====
LEXT Confocal microscope is down, please check email for updates.
+
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser.
For general motorized microscopy, you may consider the new [[Digital_Microscope_(Olympus_DSX1000)|Olympus DSX-1000]].
+
// [[User:John d|John d]] 16:47, 28 November 2022 (PST)
// [[User:John d|John d]] 16:08, 21 March 2022 (PDT)
 
  
===== New COVID protocols =====
+
===== Au Plating: DOWN =====
Please read the linked letter below (on Wiki) regarding masking policy changes, effective Saturday, March 19. 
+
Bath damaged, system is down for repair.
 +
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
  
The nanofab will follow this policy with masks being optional for everyone in all sections of the facility beginning March 19. 
+
===== E-Beam#2: Heater Down =====
 +
EB2 Heated Processing is down
 +
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
  
All users must adhere to the campus policies as outlined in the letter from Chancellor Yang, including testing where required.
+
===== NanoFab Job Openings =====
 +
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings''']
  
Link: [https://t.e2ma.net/message/opq87n/0equghb March 16th 2022- Letter from Office of the Chancellor]
+
// [[User:John d|John d]] 23:55, 4 October 2022 (PDT)
 
 
See the full policies at '''[[COVID-19_User_Policies]]'''
 
// [[User:John d|John d]] 16:08, 21 March 2022 (PDT)
 
 
 
===== New EBL Rates =====
 
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered.  The new rates are as follows:
 
 
 
Industrial Users:  $405/hour
 
 
 
UC Academic Users:  $126/hour
 
 
 
Non-UC Academic Users:  $150/hour
 
 
 
UCSB CNSI Incubator USers:  $260/hour
 
 
 
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 57: Line 44:
  
  
====== HOW TO ADD NEWS ITEMS ======
+
====== HOW TO ADD ITEMS ======
  
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.

Latest revision as of 16:47, 28 November 2022

Important Announcements


MA6: service 11/30

The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)

ASML: Down on Dec 12th

On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)