Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted Microscope service)
(asml update)
 
(76 intermediate revisions by 5 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
'''''Equipment Status'''''
+
'''''Important Announcements'''''
 
----
 
----
 
<!--
 
<!--
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
==== GCA Autostep and 6300 October Maintenance ====
+
===== ASML Down =====
The vendor will be here October 25 until October 28 to service both steppers. The Autostep will be Monday thru Wednesday from 8am until 6pm. The 6300 will be serviced on Thursday from 8am until 6pm.
 
[[User:Silva|Silva]] 08:39, 12 October 2021 (PDT)
 
  
 +
New Temp Ctl Unit will be installed tomorrow, planning to let it stabilize temps over the weekend.
 +
If it all goes smoothly, we'll run system cals (focus/overlay etc.) on Monday.
  
===== Oxford ICP Installed =====
+
New computer and new Mains Power supply have been installed, along with one rack CPU board that failed - these are all operating nominally so far. Nanofiles sync & JobCreator will be reinstituted later next week/following week. All user jobs have be copied over.
A new ICP etcher for III-V etches (GaAs, InP, GaN) has been installed: [[Oxford_ICP_Etcher_(PlasmaPro_100_Cobra)]]
+
// [[User:John d|John d]] 21:08, 23 June 2022 (PDT)
  
Contact [[Tony_Bosch | the supervisor]] for training.
+
===== Face-Masks Optional as of June 13 =====
// [[User:John d|John d]] 08:00, 30 September 2021 (PDT)
+
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.  
  
===== New COVID Protocols =====
+
We will still provide masks at the metal table in front of the cleanroom entry.
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
+
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
  
This direction applies to all vaccinated and non-vaccinated persons.
+
See the full policies at '''[[COVID-19_User_Policies]]'''
 +
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
  
Outdoor policies remain unchanged
+
===== PureStrip Bath Heater UP =====
 +
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use.
 +
// [[User:John d|John d]] 08:29, 21 June 2022 (PDT)
  
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.
+
===== Unaxis-Dep: Up =====
 +
New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good.  Films are ready to use.
 +
// [[User:John d|John d]] 10:11, 17 June 2022 (PDT)
  
See the full policies at [[COVID-19_User_Policies]]
+
===== Gasonics Down =====
 +
Leak in main chamber, tool is down.
 +
// [[User:John d|John d]] 14:35, 27 May 2022 (PDT)
  
// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)
+
===== New EBL Rates =====
 +
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered.  The new rates are as follows:
  
===== Weekly Testing strongly urged for UCSB Students/Staff =====
+
Industrial Users:  $405/hour
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
 
  
Weekly recurring appointments can be made at the Student Health website:
+
UC Academic Users: $126/hour
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
 
  
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
+
Non-UC Academic Users: $150/hour
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
 
  
===== NanoFab COVID Protocols =====
+
UCSB CNSI Incubator USers:  $260/hour
 
 
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
 
 
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
 
  
 +
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 72: Line 74:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 21:08, 23 June 2022

Important Announcements


ASML Down

New Temp Ctl Unit will be installed tomorrow, planning to let it stabilize temps over the weekend. If it all goes smoothly, we'll run system cals (focus/overlay etc.) on Monday.

New computer and new Mains Power supply have been installed, along with one rack CPU board that failed - these are all operating nominally so far. Nanofiles sync & JobCreator will be reinstituted later next week/following week. All user jobs have be copied over. // John d 21:08, 23 June 2022 (PDT)

Face-Masks Optional as of June 13

You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.

We will still provide masks at the metal table in front of the cleanroom entry. See the UCSB announcement at this link.

See the full policies at COVID-19_User_Policies // John d 11:20, 13 June 2022 (PDT)

PureStrip Bath Heater UP

The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use. // John d 08:29, 21 June 2022 (PDT)

Unaxis-Dep: Up

New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use. // John d 10:11, 17 June 2022 (PDT)

Gasonics Down

Leak in main chamber, tool is down. // John d 14:35, 27 May 2022 (PDT)

New EBL Rates

Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:

Industrial Users: $405/hour

UC Academic Users: $126/hour

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//Thibeault 12:21, 9 December 2021 (PST)