Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted Flu Season notice, shortened Weekly Testing article)
 
(248 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
<!--feedBurner name="UCSBNanofab-Announcements" /-->
+
=====Unaxis ICP-PECVD is DOWN=====
<!-- Description of the RSS feed -->
+
I removed the wafer that was stuck in the process chamber. Once again it was user error. You MUST remove ALL of the resist from the outer 5-7mm of your wafer when processing with 100mm substrates.
'''''Equipment Status'''''
+
Sadly the system is still down. I looked into the RF1 tuning issues and it looks as though it has failed completely. I tried replacing the AMT controller but the failure mode didn't change. I did notice that when I placed the AMT controller in Manual and tried to drive the caps the matching network was unresponsive. It looks like the matching network may need to be replaced.-Tony
----
+
//[[User:Mehalana v|Vraj Mehalana]] 09:25, 30 May 2023 (PDT)
 +
=====IBD UP=====
 +
We received the new Xe bottle, and it was installed, leak checked, and tested without issue.
 +
IBD is back up and available for use.
 +
I apologize for any inconvenience.
 +
//[[User:Mehalana v|Vraj Mehalana]] 12:20, 25 May 2023 (PDT)
 +
=====Plasma Activation (EVG 810)=====
 +
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
 +
Runs will still require Staff supervision until then.
 +
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)
 +
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
+
In order for your post to show up correctly, you need to:
Please use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
+
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
Use FOUR tilde's to insert your signature at the end of your post: ~~~~
+
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
 
===== ASML Service: Monday 4/26 10am =====
 
Next week on Monday April 26th, we will take the tool down starting at 10am to work on the intermittent Reticle handling issue.  I don't expect the service to go beyond ~5pm.
 
// [[User:John d|John d]] 08:07, 20 April 2021 (PDT)
 
 
===== ASML Service: May 17-21 =====
 
ASML Engineers will be servicing Stepper #3 from Monday May 17th to Friday May 21st, for a full hose-replacement service.  The Tool will be unavailable during this whole time, please plan your fabrication accordingly.
 
 
// [[User:John d|John d]] 07:32, 20 April 2021 (PDT)
 
 
===== Weekly Testing strongly urged for UCSB Students/Staff =====
 
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
 
 
Weekly recurring appointments can be made at the Student Health website:
 
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
 
 
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
 
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
 
 
===== NanoFab COVID Protocols =====
 
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
 
 
Contact the [[Brian Thibeault|Lab Director]] for more information.
 
 
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
 
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
 
  
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
<!---------------------------------------------->
+
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
+
====== HOW TO ADD ITEMS ======
 
 
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way.  (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way.  (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.  
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.  
 
* Use double-slash:  //  at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash:  //  at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.  
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.  
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  
Line 67: Line 45:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
// ~~~~
+
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
  
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 09:26, 30 May 2023

Unaxis ICP-PECVD is DOWN

I removed the wafer that was stuck in the process chamber. Once again it was user error. You MUST remove ALL of the resist from the outer 5-7mm of your wafer when processing with 100mm substrates. Sadly the system is still down. I looked into the RF1 tuning issues and it looks as though it has failed completely. I tried replacing the AMT controller but the failure mode didn't change. I did notice that when I placed the AMT controller in Manual and tried to drive the caps the matching network was unresponsive. It looks like the matching network may need to be replaced.-Tony //Vraj Mehalana 09:25, 30 May 2023 (PDT)

IBD UP

We received the new Xe bottle, and it was installed, leak checked, and tested without issue. IBD is back up and available for use. I apologize for any inconvenience. //Vraj Mehalana 12:20, 25 May 2023 (PDT)

Plasma Activation (EVG 810)

We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. Runs will still require Staff supervision until then. //Vraj Mehalana 18:01, 2 May 2023 (PDT)