Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted "lab shutdown")
(ASML update, system up, software fixed)
 
(121 intermediate revisions by 5 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
'''''Equipment Status'''''
+
'''''Important Announcements'''''
 
----
 
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  
Please use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
+
In order for your post to show up correctly, you need to:
 +
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
 +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== GCA 6300 April Service =====
+
===== ASML Up =====
  
The vendor will be here to service the GCA 6300 starting Friday April 16, 2021 at 8:00am. The service will be finished Monday April 19, 2021 after calibration is completed. The system will not be available in the evenings during this time.
+
System is fully calibrated and ready to use. We are running a newer computer, so we expect there to be some differences.
  
[[User:Silva|Silva]] 07:25, 24 March 2021 (PDT)
+
Old jobs have been copied over, software options restored, and all old Jobs can be run/edited without issue.
  
===== GCA Autostep April Service =====
+
Nanofiles sync & JobCreator functionality will be restored in the next 2 weeks.
  
The vendor will be here April 19, 2021 to service the GCA Autostep. The service will start at 8:00am and will finish by early afternoon.
+
// [[User:John d|John d]] 09:44, 28 June 2022 (PDT)
  
[[User:Silva|Silva]] 07:25, 24 March 2021 (PDT)
+
===== Face-Masks Optional as of June 13 =====
 +
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
  
===== Weekly Testing strongly urged for UCSB Students/Staff =====
+
We will still provide masks at the metal table in front of the cleanroom entry.
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
+
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
  
Weekly recurring appointments can be made as follows:
+
See the full policies at '''[[COVID-19_User_Policies]]'''
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
+
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
* Select “''Appointments''” and then select “''COVID-19 Services''.”
 
* Select “''I need to schedule my weekly COVID-19 testing''” and answer the questions.
 
* Select an available date and time and click “''Continue''.”
 
* Confirm your appointment date and time and then click “''Schedule''.”
 
** Note: You must click “''Schedule''” or your appointment will not be confirmed. Also, be sure to add the appointment time and location to your calendar.
 
  
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
+
===== PureStrip Bath Heater UP =====
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)  
+
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use.
 +
// [[User:John d|John d]] 08:29, 21 June 2022 (PDT)
  
===== UCSB Flu Vaccination Mandate =====
+
===== Unaxis-Dep: Up =====
UCSB Students, Staff and Faculty are required to recieve a Flu Vaccine by Nov. 1st. <br>Please see the '''[[COVID-19_User_Policies#UCSB_Flu_Vaccination_Mandate|COVID19 Page]]''' for relevant links and information.
+
New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good.  Films are ready to use.
// [[User:John d|John d]] 19:47, 13 October 2020 (PDT)
+
// [[User:John d|John d]] 10:11, 17 June 2022 (PDT)
  
===== NanoFab COVID Protocols =====
+
===== Gasonics Down =====
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
+
Leak in main chamber, tool is down.
 +
// [[User:John d|John d]] 14:35, 27 May 2022 (PDT)
  
Contact the [[Brian Thibeault|Lab Director]] for more information.
+
===== New EBL Rates =====
 +
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered.  The new rates are as follows:
  
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
+
Industrial Users:  $405/hour
  
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
+
UC Academic Users:  $126/hour
  
 +
Non-UC Academic Users:  $150/hour
 +
 +
UCSB CNSI Incubator USers:  $260/hour
 +
 +
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 70: Line 76:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 09:44, 28 June 2022

Important Announcements


ASML Up

System is fully calibrated and ready to use. We are running a newer computer, so we expect there to be some differences.

Old jobs have been copied over, software options restored, and all old Jobs can be run/edited without issue.

Nanofiles sync & JobCreator functionality will be restored in the next 2 weeks.

// John d 09:44, 28 June 2022 (PDT)

Face-Masks Optional as of June 13

You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.

We will still provide masks at the metal table in front of the cleanroom entry. See the UCSB announcement at this link.

See the full policies at COVID-19_User_Policies // John d 11:20, 13 June 2022 (PDT)

PureStrip Bath Heater UP

The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use. // John d 08:29, 21 June 2022 (PDT)

Unaxis-Dep: Up

New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use. // John d 10:11, 17 June 2022 (PDT)

Gasonics Down

Leak in main chamber, tool is down. // John d 14:35, 27 May 2022 (PDT)

New EBL Rates

Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:

Industrial Users: $405/hour

UC Academic Users: $126/hour

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//Thibeault 12:21, 9 December 2021 (PST)