Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(moved GCA items into main RSS section)
(AutoStep up.)
 
(148 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
'''''Equipment Status'''''
+
'''''Important Announcements'''''
 
----
 
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  
Please use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
+
In order for your post to show up correctly, you need to:
 +
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
 +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== GCA 6300 April Service =====
+
===== SEM#1 (FEI): UP =====
 +
The field service engineer has finished with the alignments and the system is ready to use.
 +
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT)
  
The vendor will be here to service the GCA 6300 starting Friday April 16, 2021 at 8:00am. The service will be finished Monday April 19, 2021 after calibration is completed. The system will not be available in the evenings during this time.
+
===== Stepper #2 (Autostep): UP =====
 +
System up. Please note the maintenance schedule this week. // [[User:John d|John d]] 10:54, 26 September 2022 (PDT)
  
[[User:Silva|Silva]] 07:25, 24 March 2021 (PDT)
+
===== E-Beam#2: Heater Down =====
 +
EB2 Heated Processing is down
 +
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
  
===== GCA Autostep April Service =====
+
===== GCA AutoStep Service =====
 +
Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.
  
The vendor will be here April 19, 2021 to service the GCA Autostep. The service will start at 8:00am and will finish by early afternoon.
+
// [[User:John d|John d]] 08:30, 19 September 2022 (PDT)
  
[[User:Silva|Silva]] 07:25, 24 March 2021 (PDT)
+
===== GCA 6300 Service =====
 +
GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.
  
===== Weekly Testing strongly urged for UCSB Students/Staff =====
+
// [[User:John d|John d]] 08:33, 19 September 2022 (PDT)
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
 
  
Weekly recurring appointments can be made as follows:
+
===== MLA 150 Service & Software Revision =====
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
 
* Select “''Appointments''” and then select “''COVID-19 Services''.”
 
* Select “''I need to schedule my weekly COVID-19 testing''” and answer the questions.
 
* Select an available date and time and click “''Continue''.”
 
* Confirm your appointment date and time and then click “''Schedule''.”
 
** Note: You must click “''Schedule''” or your appointment will not be confirmed. Also, be sure to add the appointment time and location to your calendar.
 
  
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
+
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th.
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)  
+
// [[User:Sawyer l|L Sawyer]] 13:32, 31 August 2022 (PDT)
  
===== UCSB Flu Vaccination Mandate =====
+
===== ASML Up; Network status =====
UCSB Students, Staff and Faculty are required to recieve a Flu Vaccine by Nov. 1st. <br>Please see the '''[[COVID-19_User_Policies#UCSB_Flu_Vaccination_Mandate|COVID19 Page]]''' for relevant links and information.
 
// [[User:John d|John d]] 19:47, 13 October 2020 (PDT)
 
  
===== NanoFab COVID Protocols =====
+
Nanofiles sync & JobCreator functionality is in the process of being restored.
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.  
+
Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.
 
 
Contact the [[Brian Thibeault|Lab Director]] for more information.
 
 
 
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
 
 
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
 
  
 +
// [[User:John d|John d]] 01:53, 17 September 2022 (PDT)
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 70: Line 65:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 10:54, 26 September 2022

Important Announcements


SEM#1 (FEI): UP

The field service engineer has finished with the alignments and the system is ready to use. // John d 14:27, 21 September 2022 (PDT)

Stepper #2 (Autostep): UP

System up. Please note the maintenance schedule this week. // John d 10:54, 26 September 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

GCA AutoStep Service

Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.

// John d 08:30, 19 September 2022 (PDT)

GCA 6300 Service

GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.

// John d 08:33, 19 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.

// John d 01:53, 17 September 2022 (PDT)