Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Delete MLA & ASML)
(corrected EB3 --> EB2, AUtostep down RMS)
 
(150 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
'''''Equipment Status'''''
+
'''''Important Announcements'''''
 
----
 
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  
Please use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
+
In order for your post to show up correctly, you need to:
 +
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
 +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
 +
===== SEM#1 (FEI): UP =====
 +
The field service engineer has finished with the alignments and the system is ready to use.
 +
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT)
  
===== Weekly Testing strongly urged for UCSB Students/Staff =====
+
===== Stepper #2 (Autostep): Down =====
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
+
The tool remains down while we work with the vendor to resolve the issue with the reticle handler.
 +
// [[User:John d|John d]] 07:34, 22 September 2022 (PDT)
  
Weekly recurring appointments can be made as follows:
+
===== E-Beam#2: Heater Down =====
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
+
EB2 Heated Processing is down
* Select “''Appointments''” and then select “''COVID-19 Services''.”
+
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
* Select “''I need to schedule my weekly COVID-19 testing''” and answer the questions.
 
* Select an available date and time and click “''Continue''.”
 
* Confirm your appointment date and time and then click “''Schedule''.”
 
** Note: You must click “''Schedule''” or your appointment will not be confirmed. Also, be sure to add the appointment time and location to your calendar.
 
  
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
+
===== GCA AutoStep Service =====
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
+
Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.
  
===== UCSB Flu Vaccination Mandate =====
+
// [[User:John d|John d]] 08:30, 19 September 2022 (PDT)
UCSB Students, Staff and Faculty are required to recieve a Flu Vaccine by Nov. 1st. <br>Please see the '''[[COVID-19_User_Policies#UCSB_Flu_Vaccination_Mandate|COVID19 Page]]''' for relevant links and information.
 
// [[User:John d|John d]] 19:47, 13 October 2020 (PDT)
 
  
===== NanoFab COVID Protocols =====
+
===== GCA 6300 Service =====
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.  
+
GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.
  
Contact the [[Brian Thibeault|Lab Director]] for more information.
+
// [[User:John d|John d]] 08:33, 19 September 2022 (PDT)
  
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
+
===== MLA 150 Service & Software Revision =====
  
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
+
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th.
 +
// [[User:Sawyer l|L Sawyer]] 13:32, 31 August 2022 (PDT)
  
 +
===== ASML Up; Network status =====
 +
 +
Nanofiles sync & JobCreator functionality is in the process of being restored.
 +
Batch_Reports are now syncing.  JobCreator is working but local scripts are still being written + tested.
 +
 +
// [[User:John d|John d]] 01:53, 17 September 2022 (PDT)
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 59: Line 66:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 07:34, 22 September 2022

Important Announcements


SEM#1 (FEI): UP

The field service engineer has finished with the alignments and the system is ready to use. // John d 14:27, 21 September 2022 (PDT)

Stepper #2 (Autostep): Down

The tool remains down while we work with the vendor to resolve the issue with the reticle handler. // John d 07:34, 22 September 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

GCA AutoStep Service

Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.

// John d 08:30, 19 September 2022 (PDT)

GCA 6300 Service

GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.

// John d 08:33, 19 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.

// John d 01:53, 17 September 2022 (PDT)