Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to: navigation, search
m (corrected date, COVID on top)
 
(60 intermediate revisions by 4 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
''Equipment Status''
+
'''''Equipment Status'''''
  +
----
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
  +
Please use FIVE equal-signs for the heading level. eg.: ===== my post =====
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== Unaxis ICP-PECVD =====
+
===== NanoFab COVID Response =====
  +
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool.
 
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST)
 
   
  +
Contact the [[Brian Thibeault|Lab Director]] for more information.
===== Cleanroom Shutdown on 11/21 =====
 
The cleanroom will be closed from 7-9am on Thursday, November 21st for fire system testing. No one will be allowed in the lab during this time. Please plan accordingly.
 
[[User:Hopkins a|Hopkins a]] 15:44, 6 November 2019 (PST)
 
   
  +
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
===== IBD =====
 
The IBD is Down for maintenance. The system will be down until late next week, 11/15/19, or early the following week. We will send out an email once the system is ready to use.
 
[[User:Silva|Silva]] 15:21, 8 November 2019 (PST)
 
   
===== Suss Bonder =====
+
===== ASML Maintenance: Aug. 11-15th =====
  +
ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th.
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options.
 
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT)
+
// [[User:John d|John d]] 14:50, 19 July 2020 (PDT)
  +
  +
===== New Tool Installations =====
  +
See the [https://wiki.nanotech.ucsb.edu/w/index.php/Main_Page#mp-trivia-h2 News Feed] for info on two upcoming tool installations! We have a [https://www.raith.com/products/velion.html?mobile=0 Raith Velion FIB] and a [https://heidelberg-instruments.com/en/products/mla150.html Heidelberg MLA150 Maskless Aligner] on the way.
  +
  +
// [[User:John d|John d]] 17:48, 2 June 2020 (PDT)
  +
  +
===== Unaxis ICP-PECVD =====
  +
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.
   
  +
// [[User:Thibeault|Thibeault]] 14:22, 26 March 2020 (PDT)
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Latest revision as of 16:35, 19 July 2020

Equipment Status


NanoFab COVID Response

Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.

Contact the Lab Director for more information.

// John d 15:00, 19 July 2020 (PDT)

ASML Maintenance: Aug. 11-15th

ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th. // John d 14:50, 19 July 2020 (PDT)

New Tool Installations

See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.

// John d 17:48, 2 June 2020 (PDT)

Unaxis ICP-PECVD

The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.

// Thibeault 14:22, 26 March 2020 (PDT)