Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML Dec 12th Laser PM)
 
(302 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
''Equipment Status''
+
'''''Important Announcements'''''
 +
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 +
 
 +
In order for your post to show up correctly, you need to:
 +
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
 +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== RIE#5 =====
+
===== MA6: service 11/30 =====
RIE#5 will be DOWN Tuesday and Wednesday October 1st and 2nd for a turbo upgrade. We will send out an email Wednesday once the system is up and running.
+
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed.
[[User:Silva|Silva]] 15:19, 29 September 2019 (PDT)
+
// [[User:John d|John d]] 08:26, 20 November 2022 (PST)
  
 +
===== ASML: Down on Dec 12th =====
 +
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser.
 +
// [[User:John d|John d]] 16:47, 28 November 2022 (PST)
  
===== ASML Stepper: Maintenance Sept 30 - Oct 4 =====
+
===== Au Plating: DOWN =====
ASML will be performing quarterly maintenance from Monday Sept. 30th to Friday Oct. 4th, please plan for the tool to be down during this time.  
+
Bath damaged, system is down for repair.  
// [[User:John d|John d]] 08:39, 18 September 2019 (PDT)
+
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
  
 +
===== E-Beam#2: Heater Down =====
 +
EB2 Heated Processing is down
 +
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
  
===== Suss Bonder =====
+
===== NanoFab Job Openings =====
Suss Bonder is DOWN. The vendor installed all the hardware but failed to get the software to work. The vendor will be back sometime next week, the week of the 16th, to complete the repair/upgrade.
+
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings''']
[[User:Silva|Silva]] 15:59, 13 September 2019 (PDT)
 
  
 +
// [[User:John d|John d]] 23:55, 4 October 2022 (PDT)
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 33: Line 44:
  
  
====== HOW TO ADD NEWS ITEMS ======
+
====== HOW TO ADD ITEMS ======
  
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
Line 42: Line 53:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 16:47, 28 November 2022

Important Announcements


MA6: service 11/30

The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)

ASML: Down on Dec 12th

On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)