Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(EB2 heater update)
 
(373 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
''Equipment Status''
+
'''''Important Announcements'''''
 +
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 +
 
 +
In order for your post to show up correctly, you need to:
 +
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
 +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== Suss Bonder =====
+
===== ASML: Down on Dec 12th =====
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions.
+
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser.
// [[User:Silva|Silva]] 21:36, 13 February 2019 (PST)
+
// [[User:John d|John d]] 16:47, 28 November 2022 (PST)
 +
 
 +
===== Au Plating: DOWN =====
 +
Bath damaged, system is down for repair.
 +
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
 +
 
 +
===== E-Beam#2: Heater UP =====
 +
We tested the heater to 680°C three times without any issues. There is still the issue with the temp controller not communicating with the software which will get sorted out eventually. In the meantime you will just change the temp using the controller, directions are posted at the tool.
 +
// [[User:John d|John d]] 15:55, 6 December 2022 (PST)
  
===== GCA 6300 Stepper Maintenance =====
+
===== NanoFab Job Openings =====
The GCA 6300 Stepper maintenance is scheduled to start Monday April 1, 2019 at 8:30 am. The service should be finished by Wednesday April 3, 2019 at 6:00 pm. Please schedule you process accordingly.
+
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings''']
[[User:Silva|Silva]] 17:56, 5 March 2019 (PST)
 
  
===== GCA Autostep 200 Maintenance =====
+
// [[User:John d|John d]] 23:55, 4 October 2022 (PDT)
The GCA Autostep 200 maintenance is scheduled to start Monday April 4, 2019 at 8:30 am. The service should be finished the same day by 6:00 pm. Please schedule you process accordingly.
 
[[User:Silva|Silva]] 17:56, 5 March 2019 (PST)
 
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 30: Line 40:
  
  
====== HOW TO ADD NEWS ITEMS ======
+
====== HOW TO ADD ITEMS ======
  
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
Line 39: Line 49:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 15:55, 6 December 2022

Important Announcements


ASML: Down on Dec 12th

On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater UP

We tested the heater to 680°C three times without any issues. There is still the issue with the temp controller not communicating with the software which will get sorted out eventually. In the meantime you will just change the temp using the controller, directions are posted at the tool. // John d 15:55, 6 December 2022 (PST)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)