Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML Dec 12th Laser PM)
 
(381 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
''Equipment Status''
+
'''''Important Announcements'''''
 +
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 +
 
 +
In order for your post to show up correctly, you need to:
 +
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
 +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== Suss Bonder =====
+
===== MA6: service 11/30 =====
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions.
+
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed.
// [[User:Silva|Silva]] 21:36, 13 February 2019 (PST)
+
// [[User:John d|John d]] 08:26, 20 November 2022 (PST)
 
 
===== E-Beam#1 =====
 
The power supply and IC5 controller retrofit is complete. Every user will need to be trained to use the tool. It is now similar to E-beam #4. If you absolutely need to use the tool this weekend, Brian Lingg will hold a training session today, March 1, 2019, at 4PM. Please reply to Brian's email invitation if you’d like to attend the training session. Brian Lingg will hold many more training sessions next week, starting on Monday. Brian will send out an email announcing specific times for training Monday morning. The following materials have been setup. Ti, Au, Al, Ni, Cr, Pt, Ag, Ta, C, V.  Brian will add more next week.
 
[[User:Silva|Silva]] 15:36, 1 March 2019 (PST)
 
 
 
===== ASML DUV: PM March 12 to 15th =====
 
ASML will be performing their periodic maintenance on the DUV stepper from Tuesday March 12th through Friday March 15th.  Please schedule your work accordingly.
 
[[User:Silva|Silva]] 21:22, 4 March 2019 (PST)
 
 
 
===== Oxford Dielectric and Ion Mill =====
 
The Dielectric and Ion Mill chambers of the Oxford system are down. There is an exhaust issue with both chambers and will be addressed Wednesday March 6, 2019.
 
[[User:Silva|Silva]] 17:31, 5 March 2019 (PST)
 
  
===== GCA 6300 Stepper Maintenance =====
+
===== ASML: Down on Dec 12th =====
The GCA 6300 Stepper maintenance is scheduled to start Monday April 1, 2019 at 8:30 am. The service should be finished by Wednesday April 3, 2019 at 6:00 pm. Please schedule you process accordingly.
+
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser.
[[User:Silva|Silva]] 17:56, 5 March 2019 (PST)
+
// [[User:John d|John d]] 16:47, 28 November 2022 (PST)
  
===== GCA Autostep 200 Maintenance =====
+
===== Au Plating: DOWN =====
The GCA Autostep 200 maintenance is scheduled to start Monday April 4, 2019 at 8:30 am. The service should be finished the same day by 6:00 pm. Please schedule you process accordingly.
+
Bath damaged, system is down for repair.  
[[User:Silva|Silva]] 17:56, 5 March 2019 (PST)
+
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
  
===== IBD Maintenance =====
+
===== E-Beam#2: Heater Down =====
The IBD will be down starting Monday March 11, 2019 at 9:00 am for maintenance. This system service will take two to three weeks to complete.
+
EB2 Heated Processing is down
[[User:Silva|Silva]] 10:22, 7 March 2019 (PST)
+
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
  
===== ICP Panasonic #2 Chamber Clean =====
+
===== NanoFab Job Openings =====
The system will be down starting Monday morning at 9:30 am for a chamber wet clean. The tool should be ready by 11:30 am the same morning for your use.
+
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings''']
[[User:Silva|Silva]] 11:50, 7 March 2019 (PST)
 
  
===== RIE#2 =====
+
// [[User:John d|John d]] 23:55, 4 October 2022 (PDT)
The system is down for front panel switch failure. The issue will be addressed tomorrow.
 
[[User:Silva|Silva]] 17:34, 7 March 2019 (PST)
 
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 54: Line 44:
  
  
====== HOW TO ADD NEWS ITEMS ======
+
====== HOW TO ADD ITEMS ======
  
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
Line 63: Line 53:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 16:47, 28 November 2022

Important Announcements


MA6: service 11/30

The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)

ASML: Down on Dec 12th

On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)