Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(→‎Tool Updates: cary 500 update)
(asml UP, editing issue)
 
(616 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
<feedBurner name="UCSBNanofab-Announcements" />
+
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 +
<!-- Description of the RSS feed -->
 +
'''''Important Announcements'''''
 +
----
 
<!--
 
<!--
'''How to add new news items'''
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  
* Delete the old announcement, and replace with your new announcement
+
In order for your post to show up correctly, you need to:
* NO user signature is required for this template since only one or two items will ever be shown.  
+
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
* If you do need items to be shown in chronological order, then you must add a user signature at the end of each post via four tildes: ~~~~, then delete the name after the two dashes "--" and delete the "[[(talk)...]]" link
+
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
* "There are no announcements at this time." should be indicate when empty.
 
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
<!------------- Announcements ---------------->
+
<!------------- Equipment Status ---------------->
=== Announcements ===
 
The NanoFab has reopened, as power appears to have stabilized.
 
  
The [http://www.latimes.com/local/california/la-me-southern-california-wildfires-live-follow-live-fire-coverage-from-l-a-1512492176-htmlstory.html Thomas Fire & Rye Fire] in Ventura County caused repeated power outages on the evening of Monday 12/4.  CalFire is posting updates on [http://www.fire.ca.gov/current_incidents/incidentdetails/Index/1922 their webpage] and [https://www.facebook.com/CALFIRE FaceBook page].
+
===== ASML Up, Job editing issue =====
  
[[User:John d|Posted:]] 15:07, 7 December 2017 (PST)
+
System is fully calibrated and ready to use. We are running a newer computer, so we expect there to be some differences.
  
=== Tool Updates ===
+
There is an issue preventing users from editing jobs, but existing jobs can be run for exposure.
  
// Panasonic ICP #1:  
+
One non-blocking issue: when loading my old test-exposure job, I got a "Consistency error detected" when I Appended the Batch.  Clicking [Continue] did expose the whole wafer without issue. I've notified ASML, they will get back to us with a solution.
Pump failed. Don is installing a replacement.
+
// [[User:John d|John d]] 18:59, 27 June 2022 (PDT)
  
// GCA 6300 Stepper #1:
+
===== Face-Masks Optional as of June 13 =====
Lamp power supply failure. Replacement is being shipped.
+
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.  
  
// Cary 500:
+
We will still provide masks at the metal table in front of the cleanroom entry.
UV-Vis Detector Failure. Locating replacement.
+
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
  
// [[User:John d|Posted:]] 15:06, 7 December 2017 (PST)
+
See the full policies at '''[[COVID-19_User_Policies]]'''
<!---------- end of announcements ------------>
+
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
 +
 
 +
===== PureStrip Bath Heater UP =====
 +
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use.
 +
// [[User:John d|John d]] 08:29, 21 June 2022 (PDT)
 +
 
 +
===== Unaxis-Dep: Up =====
 +
New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good.  Films are ready to use.
 +
// [[User:John d|John d]] 10:11, 17 June 2022 (PDT)
 +
 
 +
===== Gasonics Down =====
 +
Leak in main chamber, tool is down.
 +
// [[User:John d|John d]] 14:35, 27 May 2022 (PDT)
 +
 
 +
===== New EBL Rates =====
 +
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered.  The new rates are as follows:
 +
 
 +
Industrial Users:  $405/hour
 +
 
 +
UC Academic Users:  $126/hour
 +
 
 +
Non-UC Academic Users:  $150/hour
 +
 
 +
UCSB CNSI Incubator USers:  $260/hour
 +
 
 +
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 +
 
 +
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 +
<!--------------------------------------------
 +
 +
 +
 +
 +
====== HOW TO ADD NEWS ITEMS ======
 +
 +
* You can copy/paste the example below for a new news item.
 +
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way.  (This looks best on the Wiki homepage)
 +
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 +
* Use double-slash:  //  at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 +
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 +
* Please use "There are no announcements at this time." if the announcements are empty.
 +
 +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
 +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
 +
 +
 +
******** EXAMPLE OF A NEW POST ********
 +
 +
===== NanoFab making LN2 icecream =====
 +
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 +
// ~~~~
 +
 +
************* (end of example) **************
 +
The ~~~~ will be replaced with your username & timestamp after you submit the post.
 +
---------------------------------------------->

Latest revision as of 18:59, 27 June 2022

Important Announcements


ASML Up, Job editing issue

System is fully calibrated and ready to use. We are running a newer computer, so we expect there to be some differences.

There is an issue preventing users from editing jobs, but existing jobs can be run for exposure.

One non-blocking issue: when loading my old test-exposure job, I got a "Consistency error detected" when I Appended the Batch. Clicking [Continue] did expose the whole wafer without issue. I've notified ASML, they will get back to us with a solution. // John d 18:59, 27 June 2022 (PDT)

Face-Masks Optional as of June 13

You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.

We will still provide masks at the metal table in front of the cleanroom entry. See the UCSB announcement at this link.

See the full policies at COVID-19_User_Policies // John d 11:20, 13 June 2022 (PDT)

PureStrip Bath Heater UP

The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use. // John d 08:29, 21 June 2022 (PDT)

Unaxis-Dep: Up

New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use. // John d 10:11, 17 June 2022 (PDT)

Gasonics Down

Leak in main chamber, tool is down. // John d 14:35, 27 May 2022 (PDT)

New EBL Rates

Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:

Industrial Users: $405/hour

UC Academic Users: $126/hour

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//Thibeault 12:21, 9 December 2021 (PST)