+ | =====Unaxis ICP-PECVD is DOWN===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | I removed the wafer that was stuck in the process chamber. Once again it was user error. You MUST remove ALL of the resist from the outer 5-7mm of your wafer when processing with 100mm substrates. |
||
− | <!-- Description of the RSS feed --> |
||
+ | Sadly the system is still down. I looked into the RF1 tuning issues and it looks as though it has failed completely. I tried replacing the AMT controller but the failure mode didn't change. I did notice that when I placed the AMT controller in Manual and tried to drive the caps the matching network was unresponsive. It looks like the matching network may need to be replaced.-Tony |
||
− | ''UCSB NanoFab Announcements'' |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:25, 30 May 2023 (PDT) |
||
⚫ | |||
⚫ | |||
− | '''How to add new news items''' |
||
+ | We received the new Xe bottle, and it was installed, leak checked, and tested without issue. |
||
+ | IBD is back up and available for use. |
||
+ | I apologize for any inconvenience. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 12:20, 25 May 2023 (PDT) |
||
+ | =====Plasma Activation (EVG 810)===== |
||
+ | We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. |
||
+ | Runs will still require Staff supervision until then. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT) |
||
⚫ | |||
⚫ | |||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
⚫ | |||
+ | In order for your post to show up correctly, you need to: |
||
⚫ | |||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
⚫ | |||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
− | <!------------- |
+ | <!------------- Equipment Status ----------------> |
− | ===== Announcements ===== |
||
− | There are no announcements at this time. |
||
⚫ | |||
⚫ | |||
− | Problem with load lock gate valve. Currently down. |
||
− | // [[User:John d|Posted:]] 15:40, 8 February 2018 (PST) |
||
⚫ | |||
⚫ | |||
⚫ | |||
− | UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector. |
||
− | // [[User:John d|Posted:]] 15:06, 7 December 2017 (PST) |
||
− | |||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
+ | <!-------------------------------------------- |
||
⚫ | |||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | |||
+ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
+ | |||
+ | ===== NanoFab making LN2 icecream ===== |
||
+ | Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
+ | |||
+ | ************* (end of example) ************** |
||
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
+ | ----------------------------------------------> |
Revision as of 09:26, 30 May 2023
Unaxis ICP-PECVD is DOWN
I removed the wafer that was stuck in the process chamber. Once again it was user error. You MUST remove ALL of the resist from the outer 5-7mm of your wafer when processing with 100mm substrates. Sadly the system is still down. I looked into the RF1 tuning issues and it looks as though it has failed completely. I tried replacing the AMT controller but the failure mode didn't change. I did notice that when I placed the AMT controller in Manual and tried to drive the caps the matching network was unresponsive. It looks like the matching network may need to be replaced.-Tony //Vraj Mehalana 09:25, 30 May 2023 (PDT)
IBD UP
We received the new Xe bottle, and it was installed, leak checked, and tested without issue. IBD is back up and available for use. I apologize for any inconvenience. //Vraj Mehalana 12:20, 25 May 2023 (PDT)
Plasma Activation (EVG 810)
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. Runs will still require Staff supervision until then. //Vraj Mehalana 18:01, 2 May 2023 (PDT)