+ | I removed the wafer that was stuck in the process chamber. Once again it was user error. You MUST remove ALL of the resist from the outer 5-7mm of your wafer when processing with 100mm substrates. |
||
⚫ | |||
+ | Sadly the system is still down. I looked into the RF1 tuning issues and it looks as though it has failed completely. I tried replacing the AMT controller but the failure mode didn't change. I did notice that when I placed the AMT controller in Manual and tried to drive the caps the matching network was unresponsive. It looks like the matching network may need to be replaced.-Tony |
||
− | '''How to add new news items''' |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:25, 30 May 2023 (PDT) |
||
⚫ | |||
+ | We received the new Xe bottle, and it was installed, leak checked, and tested without issue. |
||
+ | IBD is back up and available for use. |
||
+ | I apologize for any inconvenience. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 12:20, 25 May 2023 (PDT) |
||
+ | =====Plasma Activation (EVG 810)===== |
||
+ | We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. |
||
+ | Runs will still require Staff supervision until then. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT) |
||
⚫ | |||
− | * Delete the old announcement, and replace with your new announcement |
||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
− | * Use level 5 heading for each item |
||
+ | In order for your post to show up correctly, you need to: |
||
⚫ | |||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
⚫ | |||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
− | <!------------- |
+ | <!------------- Equipment Status ----------------> |
− | ===== Announcements ===== |
||
− | // The NanoFab is Open. |
||
− | // The [http://countyofsb.org/thomasfire.sbc Thomas Fire] has caused repeated power outages since the evening of Monday 12/4. CalFire is posting updates on [http://www.fire.ca.gov/current_incidents/incidentdetails/Index/1922 their webpage] and [https://www.facebook.com/CALFIRE FaceBook page]. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | <!-------------------------------------------- |
||
⚫ | |||
+ | * You can copy/paste the example below for a new news item. |
||
+ | * Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
+ | * Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
⚫ | |||
⚫ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
⚫ | |||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
− | Pump failed. Don is installing a replacement. |
||
− | // [[User:John d|Posted:]] 15:06, 7 December 2017 (PST) |
||
⚫ | |||
− | Lamp power supply failure. Replacement is being shipped. |
||
− | // [[User:John d|Posted:]] 15:06, 7 December 2017 (PST) |
||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
⚫ | |||
− | UV-Vis Detector Failure. Locating replacement. |
||
− | // [[User:John d|Posted:]] 15:06, 7 December 2017 (PST) |
||
+ | ===== NanoFab making LN2 icecream ===== |
||
⚫ | |||
+ | Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | |||
⚫ | |||
+ | ************* (end of example) ************** |
||
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
+ | ----------------------------------------------> |
Revision as of 09:26, 30 May 2023
Unaxis ICP-PECVD is DOWN
I removed the wafer that was stuck in the process chamber. Once again it was user error. You MUST remove ALL of the resist from the outer 5-7mm of your wafer when processing with 100mm substrates. Sadly the system is still down. I looked into the RF1 tuning issues and it looks as though it has failed completely. I tried replacing the AMT controller but the failure mode didn't change. I did notice that when I placed the AMT controller in Manual and tried to drive the caps the matching network was unresponsive. It looks like the matching network may need to be replaced.-Tony //Vraj Mehalana 09:25, 30 May 2023 (PDT)
IBD UP
We received the new Xe bottle, and it was installed, leak checked, and tested without issue. IBD is back up and available for use. I apologize for any inconvenience. //Vraj Mehalana 12:20, 25 May 2023 (PDT)
Plasma Activation (EVG 810)
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. Runs will still require Staff supervision until then. //Vraj Mehalana 18:01, 2 May 2023 (PDT)