Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML PM Complete)
(ASML Dec 12th Laser PM)
(9 intermediate revisions by 3 users not shown)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== ASML UP =====
+
===== MA6: service 11/30 =====
  +
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed.
PM complete, system is up.
 
// [[User:John d|John d]] 13:25, 4 November 2022 (PDT)
+
// [[User:John d|John d]] 08:26, 20 November 2022 (PST)
  +
 
===== ASML: Down on Dec 12th =====
  +
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser.
 
// [[User:John d|John d]] 16:47, 28 November 2022 (PST)
   
 
===== Au Plating: DOWN =====
 
===== Au Plating: DOWN =====
Line 25: Line 29:
 
EB2 Heated Processing is down
 
EB2 Heated Processing is down
 
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
 
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
 
===== MLA 150 Software Revision =====
 
The MLA has new software - make sure to see the updated operating procedures.
 
In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details.
 
// [[User:John d|John d]] 16:27, 17 October 2022 (PDT)
 
 
===== ASML Up; Network status =====
 
 
Nanofiles sync & JobCreator functionality is in the process of being restored.
 
Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
 
 
// [[User:John d|John d]] 15:44, 29 September 2022 (PDT)
 
   
 
===== NanoFab Job Openings =====
 
===== NanoFab Job Openings =====

Revision as of 17:47, 28 November 2022

Important Announcements


MA6: service 11/30

The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)

ASML: Down on Dec 12th

On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)