Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(JEOL EBL Seminar) |
(ASML Dec 12th Laser PM) |
||
(13 intermediate revisions by 3 users not shown) | |||
Line 14: | Line 14: | ||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== MA6: service 11/30 ===== |
+ | The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. |
||
− | JEOL USA will be presenting results, specifications, and details about their latest electron beam lithography models – focusing on the 8100FS, the upgrade model for our 6300FS tool currently installed here at UCSB. |
||
⚫ | |||
⚫ | |||
− | The presentation will be held in ESB, Room 2001 (upstairs) starting at 11:30am sharp. |
||
+ | On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. |
||
− | |||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 16:47, 28 November 2022 (PST) |
− | |||
⚫ | |||
− | Hardware board not starting up, repair in progress. |
||
⚫ | |||
===== Au Plating: DOWN ===== |
===== Au Plating: DOWN ===== |
||
Bath damaged, system is down for repair. |
Bath damaged, system is down for repair. |
||
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT) |
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT) |
||
− | |||
− | ===== ASML Maintenance: Nov 1st-4th ===== |
||
− | ASML Engineers will be on site for the periodic maintenance from November 1 through November 4. |
||
− | System will be down during this time. |
||
− | // [[User:John d|John d]] 16:23, 17 October 2022 (PDT) |
||
===== E-Beam#2: Heater Down ===== |
===== E-Beam#2: Heater Down ===== |
||
EB2 Heated Processing is down |
EB2 Heated Processing is down |
||
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT) |
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT) |
||
− | |||
− | ===== MLA 150 Software Revision ===== |
||
− | The MLA has new software - make sure to see the updated operating procedures. |
||
− | In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details. |
||
− | // [[User:John d|John d]] 16:27, 17 October 2022 (PDT) |
||
− | |||
− | ===== ASML Up; Network status ===== |
||
− | |||
− | Nanofiles sync & JobCreator functionality is in the process of being restored. |
||
− | Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested. |
||
− | |||
− | // [[User:John d|John d]] 15:44, 29 September 2022 (PDT) |
||
===== NanoFab Job Openings ===== |
===== NanoFab Job Openings ===== |
Revision as of 17:47, 28 November 2022
Important Announcements
MA6: service 11/30
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)
ASML: Down on Dec 12th
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
NanoFab Job Openings
The NanoFab has current job openings, apply at: NanoFab Job Postings
// John d 23:55, 4 October 2022 (PDT)