Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(Au Plating bench down) |
(ASML Dec 12th Laser PM) |
||
(15 intermediate revisions by 3 users not shown) | |||
Line 13: | Line 13: | ||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
+ | |||
+ | ===== MA6: service 11/30 ===== |
||
+ | The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. |
||
⚫ | |||
+ | |||
⚫ | |||
+ | On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. |
||
⚫ | |||
===== Au Plating: DOWN ===== |
===== Au Plating: DOWN ===== |
||
Bath damaged, system is down for repair. |
Bath damaged, system is down for repair. |
||
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT) |
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT) |
||
− | |||
− | ===== ASML Maintenance: Nov 1st-4th ===== |
||
− | ASML Engineers will be on site for the periodic maintenance from November 1 through November 4. |
||
− | System will be down during this time. |
||
⚫ | |||
===== E-Beam#2: Heater Down ===== |
===== E-Beam#2: Heater Down ===== |
||
EB2 Heated Processing is down |
EB2 Heated Processing is down |
||
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT) |
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT) |
||
− | |||
− | ===== MLA 150 Software Revision ===== |
||
− | The MLA has new software - make sure to see the updated operating procedures. |
||
− | In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details. |
||
⚫ | |||
− | |||
⚫ | |||
− | |||
− | Nanofiles sync & JobCreator functionality is in the process of being restored. |
||
− | Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested. |
||
− | |||
− | // [[User:John d|John d]] 15:44, 29 September 2022 (PDT) |
||
===== NanoFab Job Openings ===== |
===== NanoFab Job Openings ===== |
Revision as of 17:47, 28 November 2022
Important Announcements
MA6: service 11/30
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)
ASML: Down on Dec 12th
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
NanoFab Job Openings
The NanoFab has current job openings, apply at: NanoFab Job Postings
// John d 23:55, 4 October 2022 (PDT)