Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(SEM#1 UP) |
(ASML Dec 12th Laser PM) |
||
(30 intermediate revisions by 3 users not shown) | |||
Line 14: | Line 14: | ||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== MA6: service 11/30 ===== |
+ | The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. |
||
− | The field service engineer has finished with the alignments and the system is ready to use. |
||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 08:26, 20 November 2022 (PST) |
− | ===== |
+ | ===== ASML: Down on Dec 12th ===== |
+ | On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. |
||
− | Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm. |
||
⚫ | |||
+ | ===== Au Plating: DOWN ===== |
||
⚫ | |||
+ | Bath damaged, system is down for repair. |
||
⚫ | |||
− | ===== |
+ | ===== E-Beam#2: Heater Down ===== |
+ | EB2 Heated Processing is down |
||
− | GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22. |
||
⚫ | |||
+ | ===== NanoFab Job Openings ===== |
||
⚫ | |||
+ | The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings'''] |
||
⚫ | |||
− | ===== MLA 150 Service & Software Revision ===== |
||
− | |||
− | The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. |
||
⚫ | |||
− | |||
− | ===== ASML Up; Network status ===== |
||
− | |||
− | Nanofiles sync & JobCreator functionality is in the process of being restored. |
||
− | Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested. |
||
− | |||
⚫ | |||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
||
Line 49: | Line 44: | ||
− | ====== HOW TO ADD |
+ | ====== HOW TO ADD ITEMS ====== |
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
Revision as of 17:47, 28 November 2022
Important Announcements
MA6: service 11/30
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)
ASML: Down on Dec 12th
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
NanoFab Job Openings
The NanoFab has current job openings, apply at: NanoFab Job Postings
// John d 23:55, 4 October 2022 (PDT)