Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Cl2 down)
(ASML Dec 12th Laser PM)
(47 intermediate revisions by 5 users not shown)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== All Chlorine gasses disabled =====
+
===== MA6: service 11/30 =====
  +
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed.
There is a leak in our Cl2 gas cabinet that we are currently addressing.
 
 
// [[User:John d|John d]] 08:26, 20 November 2022 (PST)
   
 
===== ASML: Down on Dec 12th =====
All Cl2 processes will be down until we have finished replacing the necessary lines/fittings. Tools will most likely be down all day tomorrow and part of Tuesday. We will have a better estimate once we break open the lines.
 
  +
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser.
 
// [[User:John d|John d]] 16:47, 28 November 2022 (PST)
   
  +
===== Au Plating: DOWN =====
An email will go out once we have an update.
 
  +
Bath damaged, system is down for repair.
// [[User:John d|John d]] 12:47, 28 August 2022 (PDT)
 
  +
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
   
===== ASML Up; Network status =====
+
===== E-Beam#2: Heater Down =====
  +
EB2 Heated Processing is down
  +
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
   
  +
===== NanoFab Job Openings =====
We are running a newer computer;
 
  +
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings''']
Nanofiles sync & JobCreator functionality will be restored in the next few weeks.
 
   
// [[User:John d|John d]] 09:00, 22 July 2022 (PDT)
+
// [[User:John d|John d]] 23:55, 4 October 2022 (PDT)
 
===== Face-Masks Optional as of June 13 =====
 
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
 
 
We will still provide masks at the metal table in front of the cleanroom entry.
 
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
 
 
See the full policies at '''[[COVID-19_User_Policies]]'''
 
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
 
 
===== New EBL Rates =====
 
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
 
Industrial Users: $405/hour
 
 
UC Academic Users: $126/hour
 
 
Non-UC Academic Users: $150/hour
 
 
UCSB CNSI Incubator USers: $260/hour
 
 
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 60: Line 44:
   
   
====== HOW TO ADD NEWS ITEMS ======
+
====== HOW TO ADD ITEMS ======
   
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.

Revision as of 17:47, 28 November 2022

Important Announcements


MA6: service 11/30

The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)

ASML: Down on Dec 12th

On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)