Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(SEM1 down) |
(deleted GCA's up) |
||
(13 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== Thermal Evap #1: DOWN ===== |
+ | We are waiting for parts to come in to complete the repair on the Bell Jar hoist. |
||
− | All: |
||
+ | We will notify once the system becomes available for use. |
||
⚫ | |||
+ | ===== E-Beam#2: Heater Down ===== |
||
− | The new filament failed during its ramp up. Another new filament should be here later this week. |
||
+ | EB2 Heated Processing is down |
||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 15:40, 21 September 2022 (PDT) |
− | |||
− | ===== AJA Sputter 4: UP ===== |
||
− | Computer repaired. |
||
− | // [[User:John d|John d]] 07:50, 13 September 2022 (PDT) |
||
− | |||
− | ===== GCA AutoStep Service ===== |
||
− | Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: |
||
− | |||
− | 9-28-22 at 8:00am to 9-29-22 at 5:00pm |
||
− | |||
⚫ | |||
===== MLA 150 Service & Software Revision ===== |
===== MLA 150 Service & Software Revision ===== |
||
Line 38: | Line 30: | ||
===== ASML Up; Network status ===== |
===== ASML Up; Network status ===== |
||
− | We are running a newer computer; |
||
Nanofiles sync & JobCreator functionality is in the process of being restored. |
Nanofiles sync & JobCreator functionality is in the process of being restored. |
||
+ | Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested. |
||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 15:44, 29 September 2022 (PDT) |
− | |||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 17:08, 3 October 2022
Important Announcements
Thermal Evap #1: DOWN
We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
MLA 150 Service & Software Revision
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)
ASML Up; Network status
Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
// John d 15:44, 29 September 2022 (PDT)