Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(asml update) |
(deleted GCA's up) |
||
(33 intermediate revisions by 4 users not shown) | |||
Line 14: | Line 14: | ||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== Thermal Evap #1: DOWN ===== |
+ | We are waiting for parts to come in to complete the repair on the Bell Jar hoist. |
||
+ | We will notify once the system becomes available for use. |
||
⚫ | |||
⚫ | |||
− | New Temp Ctl Unit will be installed tomorrow, planning to let it stabilize temps over the weekend. |
||
+ | EB2 Heated Processing is down |
||
− | If it all goes smoothly, we'll run system cals (focus/overlay etc.) on Monday. |
||
⚫ | |||
+ | ===== MLA 150 Service & Software Revision ===== |
||
− | New computer and new Mains Power supply have been installed, along with one rack CPU board that failed - these are all operating nominally so far. Nanofiles sync & JobCreator will be reinstituted later next week/following week. All user jobs have be copied over. |
||
⚫ | |||
+ | The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. |
||
− | ===== Face-Masks Optional as of June 13 ===== |
||
⚫ | |||
− | You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired. |
||
+ | ===== ASML Up; Network status ===== |
||
− | We will still provide masks at the metal table in front of the cleanroom entry. |
||
− | See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link]. |
||
+ | Nanofiles sync & JobCreator functionality is in the process of being restored. |
||
− | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
+ | Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested. |
||
⚫ | |||
⚫ | |||
⚫ | |||
− | The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use. |
||
⚫ | |||
− | |||
− | ===== Unaxis-Dep: Up ===== |
||
− | New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use. |
||
⚫ | |||
− | |||
− | ===== Gasonics Down ===== |
||
− | Leak in main chamber, tool is down. |
||
− | // [[User:John d|John d]] 14:35, 27 May 2022 (PDT) |
||
− | |||
− | ===== New EBL Rates ===== |
||
− | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
− | |||
− | Industrial Users: $405/hour |
||
− | |||
− | UC Academic Users: $126/hour |
||
− | |||
− | Non-UC Academic Users: $150/hour |
||
− | |||
− | UCSB CNSI Incubator USers: $260/hour |
||
− | |||
− | //[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST) |
||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 17:08, 3 October 2022
Important Announcements
Thermal Evap #1: DOWN
We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
MLA 150 Service & Software Revision
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)
ASML Up; Network status
Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
// John d 15:44, 29 September 2022 (PDT)