+ | ===== Thermal Evap #1: DOWN ===== |
+ | We are waiting for parts to come in to complete the repair on the Bell Jar hoist. |
||
− | New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use. |
||
+ | We will notify once the system becomes available for use. |
||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 17:06, 3 October 2022 (PDT) |
− | ===== |
+ | ===== E-Beam#2: Heater Down ===== |
+ | EB2 Heated Processing is down |
||
− | All hardware replacements are scheduled to arrive today, and ASML engineers will be on-site next week to get the system back up. |
||
⚫ | |||
+ | ===== MLA 150 Service & Software Revision ===== |
||
− | We will likely be installing a new computer on the system next week. We have all user jobs backed up, so no user data will be lost in the transfer. However, the sync scripts for python ASML-JobCreator scripting will need to be re-written, so the automatic syncing for JobCreator will be unavailable until I rewrite those. |
||
⚫ | |||
+ | The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. |
||
− | ===== Masks Optional as of June 13 ===== |
||
⚫ | |||
− | You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired. |
||
+ | ===== ASML Up; Network status ===== |
||
− | We will still provide masks at the metal table in front of the cleanroom entry. |
||
− | See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link]. |
||
+ | Nanofiles sync & JobCreator functionality is in the process of being restored. |
||
− | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
+ | Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested. |
||
⚫ | |||
⚫ | |||
− | ===== PureStrip Bath Heater DOWN ===== |
||
− | The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has failed, do not attempt to use until we replace it. |
||
⚫ | |||
− | |||
− | ===== Gasonics Down ===== |
||
− | Leak in main chamber, tool is down. |
||
− | // [[User:John d|John d]] 14:35, 27 May 2022 (PDT) |
||
− | |||
− | ===== New EBL Rates ===== |
||
− | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
− | |||
− | Industrial Users: $405/hour |
||
− | |||
− | UC Academic Users: $126/hour |
||
− | |||
− | Non-UC Academic Users: $150/hour |
||
− | |||
− | UCSB CNSI Incubator USers: $260/hour |
||
− | |||
− | //[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST) |
||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 17:08, 3 October 2022
Important Announcements
Thermal Evap #1: DOWN
We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
MLA 150 Service & Software Revision
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)
ASML Up; Network status
Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
// John d 15:44, 29 September 2022 (PDT)