Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(→‎Unaxis-Dep: Down: SiD4 ETA June 13th)
(deleted GCA's up)
(42 intermediate revisions by 4 users not shown)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== PureStrip Bath Heater DOWN =====
+
===== Thermal Evap #1: DOWN =====
  +
We are waiting for parts to come in to complete the repair on the Bell Jar hoist.
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has failed, do not attempt to use until we replace it.
 
  +
We will notify once the system becomes available for use.
// [[User:John d|John d]] 16:09, 10 June 2022 (PDT)
+
// [[User:John d|John d]] 17:06, 3 October 2022 (PDT)
   
===== ASML Down =====
+
===== E-Beam#2: Heater Down =====
  +
EB2 Heated Processing is down
Hardware delivery ETA updated to June 17th.
 
 
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
We’ll schedule an ASML engineer on-site visit to perform the installation, verification and system calibrations.
 
We may have been able to revive the TCU, but have another electrical hardware failure that requires a new part from ASML.
 
// [[User:John d|John d]] 12:54, 9 June 2022 (PDT)
 
   
===== Gasonics Down =====
+
===== MLA 150 Service & Software Revision =====
Leak in main chamber, tool is down.
 
// [[User:John d|John d]] 14:35, 27 May 2022 (PDT)
 
   
  +
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th.
===== Masks Mandatory: May 27-June 12 =====
 
 
// [[User:Sawyer l|L Sawyer]] 13:32, 31 August 2022 (PDT)
UCSB has reinstituted a mandatory mask mandate for all indoor spaces on campus.
 
   
  +
===== ASML Up; Network status =====
The mandate begins May 27, and extends through June 12.
 
   
  +
Nanofiles sync & JobCreator functionality is in the process of being restored.
See the [https://info.ia.ucsb.edu/message/4luhko/0equghb full announcement at this link].
 
  +
Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
   
 
// [[User:John d|John d]] 15:44, 29 September 2022 (PDT)
We will provide masks at the metal table in front of the cleanroom entry.
 
 
See the full policies at '''[[COVID-19_User_Policies]]'''
 
// [[User:John d|John d]] 15:48, 26 May 2022 (PDT)
 
 
===== Unaxis-Dep: Down =====
 
Deuterated Silane (SiD4) is out. Bottle expected to be delivered on Monday 6/13.
 
// [[User:John d|John d]] 16:10, 10 June 2022 (PDT)
 
 
===== New EBL Rates =====
 
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
 
Industrial Users: $405/hour
 
 
UC Academic Users: $126/hour
 
 
Non-UC Academic Users: $150/hour
 
 
UCSB CNSI Incubator USers: $260/hour
 
 
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 17:08, 3 October 2022

Important Announcements


Thermal Evap #1: DOWN

We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.

// John d 15:44, 29 September 2022 (PDT)