Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(deleted GCA's up) |
|||
(43 intermediate revisions by 4 users not shown) | |||
Line 14: | Line 14: | ||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== Thermal Evap #1: DOWN ===== |
+ | We are waiting for parts to come in to complete the repair on the Bell Jar hoist. |
||
− | The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has failed, do not attempt to use until we replace it. |
||
+ | We will notify once the system becomes available for use. |
||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 17:06, 3 October 2022 (PDT) |
− | ===== |
+ | ===== E-Beam#2: Heater Down ===== |
+ | EB2 Heated Processing is down |
||
− | Hardware delivery ETA updated to June 17th. |
||
⚫ | |||
− | We’ll schedule an ASML engineer on-site visit to perform the installation, verification and system calibrations. |
||
− | We may have been able to revive the TCU, but have another electrical hardware failure that requires a new part from ASML. |
||
− | // [[User:John d|John d]] 12:54, 9 June 2022 (PDT) |
||
− | ===== |
+ | ===== MLA 150 Service & Software Revision ===== |
− | Leak in main chamber, tool is down. |
||
− | // [[User:John d|John d]] 14:35, 27 May 2022 (PDT) |
||
+ | The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. |
||
− | ===== Masks Mandatory: May 27-June 12 ===== |
||
⚫ | |||
− | UCSB has reinstituted a mandatory mask mandate for all indoor spaces on campus. |
||
+ | ===== ASML Up; Network status ===== |
||
− | The mandate begins May 27, and extends through June 12. |
||
+ | Nanofiles sync & JobCreator functionality is in the process of being restored. |
||
− | See the [https://info.ia.ucsb.edu/message/4luhko/0equghb full announcement at this link]. |
||
+ | Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested. |
||
⚫ | |||
− | We will provide masks at the metal table in front of the cleanroom entry. |
||
− | |||
− | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
⚫ | |||
− | |||
− | ===== Unaxis-Dep: Down ===== |
||
− | Deuterated Silane (SiD4) is out. Bottle delivery delayed from vendor - see email for updates. |
||
− | // [[User:John d|John d]] 23:10, 4 June 2022 (PDT) |
||
− | |||
− | ===== New EBL Rates ===== |
||
− | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
− | |||
− | Industrial Users: $405/hour |
||
− | |||
− | UC Academic Users: $126/hour |
||
− | |||
− | Non-UC Academic Users: $150/hour |
||
− | |||
− | UCSB CNSI Incubator USers: $260/hour |
||
− | |||
− | //[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST) |
||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 17:08, 3 October 2022
Important Announcements
Thermal Evap #1: DOWN
We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
MLA 150 Service & Software Revision
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)
ASML Up; Network status
Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
// John d 15:44, 29 September 2022 (PDT)