Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(CR closure June 1, 6-9am)
(updated ASML note)
(30 intermediate revisions by 2 users not shown)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== NanoFab CLOSED: Wed June 1, 6-9am =====
+
===== ASML Up; Network status =====
'''The cleanroom will be closed to users from 6am to 9am on Wed June 1st,''' to allow Campus facilities to perform yearly emergency generator testing.
 
   
  +
We are running a newer computer;
We will send out an email once the lab is safe to enter.
 
  +
Nanofiles sync & JobCreator functionality will be restored in the next few weeks.
   
 
// [[User:John d|John d]] 09:00, 22 July 2022 (PDT)
Please plan accordingly.
 
// [[User:John d|John d]] 12:14, 24 May 2022 (PDT)
 
   
===== AFM: UP =====
+
===== Face-Masks Optional as of June 13 =====
  +
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
[[Atomic_Force_Microscope_(Bruker_ICON)|AFM]] head repaired. If you find that a pin is bent, or off axis, then STOP and immediately contact [[Bill Mitchell]]. Under no circumstances should you try to fix yourself.
 
// [[User:John d|John d]] 21:12, 19 May 2022 (PDT)
 
   
  +
We will still provide masks at the metal table in front of the cleanroom entry.
===== F50 UP =====
 
  +
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
The [[Optical_Film_Thickness_%26_Wafer-Mapping_(Filmetrics_F50)|Filmetrics F50 Wafer Mapper]] is repaired and up.
 
 
Tool has been relocated to Bay 7, just before the EBL room.
 
// [[User:John d|John d]] 07:24, 10 May 2022 (PDT)
 
 
===== New COVID protocols =====
 
Please read the linked letter below (on Wiki) regarding masking policy changes, effective Saturday, March 19.
 
 
The nanofab will follow this policy with masks being optional for everyone in all sections of the facility beginning March 19.
 
 
All users must adhere to the campus policies as outlined in the letter from Chancellor Yang, including testing where required.
 
 
Link: [https://t.e2ma.net/message/opq87n/0equghb March 16th 2022- Letter from Office of the Chancellor]
 
   
 
See the full policies at '''[[COVID-19_User_Policies]]'''
 
See the full policies at '''[[COVID-19_User_Policies]]'''
// [[User:John d|John d]] 16:08, 21 March 2022 (PDT)
+
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
   
 
===== New EBL Rates =====
 
===== New EBL Rates =====

Revision as of 09:00, 22 July 2022

Important Announcements


ASML Up; Network status

We are running a newer computer; Nanofiles sync & JobCreator functionality will be restored in the next few weeks.

// John d 09:00, 22 July 2022 (PDT)

Face-Masks Optional as of June 13

You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.

We will still provide masks at the metal table in front of the cleanroom entry. See the UCSB announcement at this link.

See the full policies at COVID-19_User_Policies // John d 11:20, 13 June 2022 (PDT)

New EBL Rates

Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:

Industrial Users: $405/hour

UC Academic Users: $126/hour

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//Thibeault 12:21, 9 December 2021 (PST)