Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(shortened ASML)
(149 intermediate revisions by 5 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
'''''Equipment Status'''''
+
'''''Important Announcements'''''
 
----
 
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  +
===== Jan 2022 UCSB COVID Protocols =====
  +
See the UCSB Email for [https://t.e2ma.net/webview/ftggrf/f0886911cb138b340f9d784d1035be8a Jan 2022 Return to Campus] on the wiki announcement page for full information and useful links.
  +
 
// [[User:Thibeault|Thibeault]] 15:37, 7 January 2022 (PST)
  +
 
===== New EBL Rates =====
  +
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
  +
  +
Industrial Users: $405/hour
  +
  +
UC Academic Users: $126/hour
  +
  +
Non-UC Academic Users: $150/hour
  +
  +
UCSB CNSI Incubator USers: $260/hour
  +
  +
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
  +
  +
===== January GCA Vendor Service =====
  +
The vendor will be here starting Monday January 17, 2022 at 8:00am to service the Autosep. The stage will be removed, so the machine will not be available for use in the evening. Service will conclude Wednesday January 19, 2022 at 5:00pm. Please schedule your process accordingly.
  +
  +
The vendor will be here to service the 6300-stepper starting Thursday January 20, 2022 at 8am. The system should be available by 5pm the same day. Please schedule your process accordingly.
 
[[User:Silva|Silva]] 09:14, 21 December 2021 (PST)
  +
  +
===== New COVID Protocols =====
  +
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
  +
  +
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.
  +
  +
This direction applies to all vaccinated and non-vaccinated persons. Outdoor policies remain unchanged.
   
  +
See the full policies at '''[[COVID-19_User_Policies]]'''
===== N2 Dry Box Cleanout, February 7th =====
 
We will be cleaning out the N2 dry box in bay 6. Anything with a label that's older than 2 months will be removed. As a reminder, the dry box is for active processing only. If you would like to store anything in a N2 only environment for greater than two months please use the vacuum sealer (in bay 4). Please let me know if you have any questions or concerns.
 
[[User:Hopkins a|Hopkins a]] 16:07, 23 January 2020 (PST)
 
   
 
// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)
===== ASML Maintenance: March 30th =====
 
ASML periodic maintenance will be on Monday March 30th, system will be down for up to 1.5 weeks.
 
// [[User:John d|John d]] 07:30, 27 January 2020 (PST)
 
   
===== Unaxis ICP-PECVD =====
 
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool.
 
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST)
 
   
===== Suss Bonder =====
 
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options.
 
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 44: Line 68:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
   
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
   
   

Revision as of 17:55, 11 January 2022

Important Announcements


Jan 2022 UCSB COVID Protocols

See the UCSB Email for Jan 2022 Return to Campus on the wiki announcement page for full information and useful links.

// Thibeault 15:37, 7 January 2022 (PST)

New EBL Rates

Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:

Industrial Users: $405/hour

UC Academic Users: $126/hour

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//Thibeault 12:21, 9 December 2021 (PST)

January GCA Vendor Service

The vendor will be here starting Monday January 17, 2022 at 8:00am to service the Autosep. The stage will be removed, so the machine will not be available for use in the evening. Service will conclude Wednesday January 19, 2022 at 5:00pm. Please schedule your process accordingly.

The vendor will be here to service the 6300-stepper starting Thursday January 20, 2022 at 8am. The system should be available by 5pm the same day. Please schedule your process accordingly. Silva 09:14, 21 December 2021 (PST)

New COVID Protocols

All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.

Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.

This direction applies to all vaccinated and non-vaccinated persons. Outdoor policies remain unchanged.

See the full policies at COVID-19_User_Policies

// Hopkins a 08:14, 6 August 2021 (PDT)