Difference between revisions of "Template:Announcements"
(pecvd2 update) |
|||
(491 intermediate revisions by 6 users not shown) | |||
Line 2: | Line 2: | ||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
<!-- Description of the RSS feed --> |
<!-- Description of the RSS feed --> |
||
− | '' |
+ | '''''Important Announcements''''' |
+ | ---- |
||
<!-- |
<!-- |
||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
− | '''How to add new news items''' |
||
+ | In order for your post to show up correctly, you need to: |
||
⚫ | |||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
⚫ | |||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
--> |
--> |
||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
− | <!------------- |
+ | <!------------- Equipment Status ----------------> |
− | ===== |
+ | ===== Jan 2022 UCSB COVID Protocols ===== |
+ | See the UCSB Email for [https://t.e2ma.net/webview/ftggrf/f0886911cb138b340f9d784d1035be8a Jan 2022 Return to Campus] on the wiki announcement page for full information and useful links. |
||
− | Down through the week of Monday the 12th, installing new HV/Sweep controller. |
||
⚫ | |||
− | Users will need retraining on these new components once the system is back up. |
||
⚫ | |||
− | ===== |
+ | ===== New EBL Rates ===== |
+ | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
− | We found an issue that most likely contributed to the high particle |
||
− | count. We will verify the particle count on Monday. Until then, I will |
||
− | release the system for use, but please assume the particle count is |
||
− | still high if running the tool before further notice. I will send out |
||
− | an email with the updated particle count Monday afternoon. |
||
⚫ | |||
+ | Industrial Users: $405/hour |
||
− | ===== Stepper #2 Maintenance ===== |
||
⚫ | |||
⚫ | |||
+ | UC Academic Users: $126/hour |
||
− | ===== Stepper #1 Maintenance Complete ===== |
||
− | 3C is finished with the maintenance on the 6300 and the system is |
||
− | ready to use. Please let us know immediately if you encounter any |
||
− | issues. |
||
− | // [[User:John d|Posted:]] 11:04, 16 March 2018 (PDT) |
||
+ | Non-UC Academic Users: $150/hour |
||
− | ===== Gasonics: Up ===== |
||
− | The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. |
||
− | // [[User:John d|Posted:]] 10:14, 12 February 2018 (PST) |
||
+ | UCSB CNSI Incubator USers: $260/hour |
||
⚫ | |||
− | UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. |
||
− | // [[User:John d|Posted:]] 13:47, 12 February 2018 (PST) |
||
+ | //[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST) |
||
⚫ | |||
+ | |||
+ | ===== January GCA Vendor Service ===== |
||
+ | The vendor will be here starting Monday January 17, 2022 at 8:00am to service the Autosep. The stage will be removed, so the machine will not be available for use in the evening. Service will conclude Wednesday January 19, 2022 at 5:00pm. Please schedule your process accordingly. |
||
+ | |||
⚫ | |||
⚫ | |||
+ | |||
⚫ | |||
+ | All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times. |
||
+ | |||
+ | Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces. |
||
+ | |||
+ | This direction applies to all vaccinated and non-vaccinated persons. Outdoor policies remain unchanged. |
||
+ | |||
+ | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
+ | |||
⚫ | |||
+ | |||
+ | |||
+ | |||
⚫ | |||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
+ | <!-------------------------------------------- |
||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ====== HOW TO ADD NEWS ITEMS ====== |
||
+ | |||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
+ | * You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | |||
+ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
+ | |||
+ | ===== NanoFab making LN2 icecream ===== |
||
+ | Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
+ | // ~~~~ |
||
+ | |||
+ | ************* (end of example) ************** |
||
+ | The ~~~~ will be replaced with your username & timestamp after you submit the post. |
||
+ | ----------------------------------------------> |
Revision as of 17:55, 11 January 2022
Important Announcements
Jan 2022 UCSB COVID Protocols
See the UCSB Email for Jan 2022 Return to Campus on the wiki announcement page for full information and useful links.
// Thibeault 15:37, 7 January 2022 (PST)
New EBL Rates
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
Industrial Users: $405/hour
UC Academic Users: $126/hour
Non-UC Academic Users: $150/hour
UCSB CNSI Incubator USers: $260/hour
//Thibeault 12:21, 9 December 2021 (PST)
January GCA Vendor Service
The vendor will be here starting Monday January 17, 2022 at 8:00am to service the Autosep. The stage will be removed, so the machine will not be available for use in the evening. Service will conclude Wednesday January 19, 2022 at 5:00pm. Please schedule your process accordingly.
The vendor will be here to service the 6300-stepper starting Thursday January 20, 2022 at 8am. The system should be available by 5pm the same day. Please schedule your process accordingly. Silva 09:14, 21 December 2021 (PST)
New COVID Protocols
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.
This direction applies to all vaccinated and non-vaccinated persons. Outdoor policies remain unchanged.
See the full policies at COVID-19_User_Policies
// Hopkins a 08:14, 6 August 2021 (PDT)