Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (EB4 title Upgrades)
(494 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
''UCSB NanoFab Announcements''
+
'''''Important Announcements'''''
  +
----
 
<!--
 
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
'''How to add new news items'''
 
   
  +
In order for your post to show up correctly, you need to:
* Use level 5 heading for each item - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
 
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
* You must add a user signature at the end of each post via four tildes: ~~~~, then after saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. Most recent date shows up at the top.
 
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
* "There are no announcements at this time." should be used to indicate when empty.
 
* Use double-slash at start of new lines - makes display on the Samsung Display look a lot better.
 
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
<!------------- Announcements ---------------->
+
<!------------- Equipment Status ---------------->
===== EBeam #4: Down for Upgrades =====
+
===== Jan 2022 UCSB COVID Protocols =====
  +
See the UCSB Email for [https://t.e2ma.net/webview/ftggrf/f0886911cb138b340f9d784d1035be8a Jan 2022 Return to Campus] on the wiki announcement page for full information and useful links.
Down through the week of Monday the 12th, installing new HV/Sweep controller.
 
   
 
// [[User:Thibeault|Thibeault]] 15:37, 7 January 2022 (PST)
Users will need retraining on these new components once the system is back up.
 
// [[User:John d|Posted:] 09:50, 6 March 2018 (PST)
 
   
===== PECVD #2: High Particulates =====
+
===== New EBL Rates =====
  +
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
We have established that there is no external atmospheric leaks in the
 
system. We still have no explanation for the high particulate count.
 
The troubleshooting will continue next week.
 
   
  +
Industrial Users: $405/hour
You can use system but particle counts still extremely high. Do not
 
use if your process is sensitive to particles.
 
// [[User:John d|Posted:]] 08:07, 11 March 2018 (PDT)
 
   
  +
UC Academic Users: $126/hour
===== Stepper #2 Maintenance =====
 
The vendor will be servicing the GCA Autostep on Thursday March 15, 2018 at 8:00AM. The system will be up and running later that afternoon. Please plan your process accordingly.
 
// [[User:John d|Posted:]] 07:40, 21 February 2018 (PST)
 
   
  +
Non-UC Academic Users: $150/hour
===== Stepper #1 Maintenance =====
 
The GCA 6300 service is going longer than expected. The tool will be down until Thursday 3/15, around early afternoon.
 
// [[User:John d|Posted:]] 08:21, 15 March 2018 (PDT)
 
   
  +
UCSB CNSI Incubator USers: $260/hour
===== Gasonics: Up =====
 
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned.
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
 
   
  +
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
===== Cary 500 Down =====
 
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options.
 
// [[User:John d|Posted:]] 13:47, 12 February 2018 (PST)
 
   
  +
===== January GCA Vendor Service =====
<!---------- end of announcements ------------>
 
  +
The vendor will be here starting Monday January 17, 2022 at 8:00am to service the Autosep. The stage will be removed, so the machine will not be available for use in the evening. Service will conclude Wednesday January 19, 2022 at 5:00pm. Please schedule your process accordingly.
  +
 
The vendor will be here to service the 6300-stepper starting Thursday January 20, 2022 at 8am. The system should be available by 5pm the same day. Please schedule your process accordingly.
 
[[User:Silva|Silva]] 09:14, 21 December 2021 (PST)
  +
 
===== New COVID Protocols =====
  +
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
  +
  +
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.
  +
  +
This direction applies to all vaccinated and non-vaccinated persons. Outdoor policies remain unchanged.
  +
  +
See the full policies at '''[[COVID-19_User_Policies]]'''
  +
 
// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)
  +
  +
  +
 
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
  +
<!--------------------------------------------
  +
  +
  +
  +
  +
====== HOW TO ADD NEWS ITEMS ======
  +
  +
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
  +
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  +
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
  +
  +
******** EXAMPLE OF A NEW POST ********
  +
  +
===== NanoFab making LN2 icecream =====
  +
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// ~~~~
  +
  +
************* (end of example) **************
  +
The ~~~~ will be replaced with your username & timestamp after you submit the post.
  +
---------------------------------------------->

Revision as of 17:55, 11 January 2022

Important Announcements


Jan 2022 UCSB COVID Protocols

See the UCSB Email for Jan 2022 Return to Campus on the wiki announcement page for full information and useful links.

// Thibeault 15:37, 7 January 2022 (PST)

New EBL Rates

Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:

Industrial Users: $405/hour

UC Academic Users: $126/hour

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//Thibeault 12:21, 9 December 2021 (PST)

January GCA Vendor Service

The vendor will be here starting Monday January 17, 2022 at 8:00am to service the Autosep. The stage will be removed, so the machine will not be available for use in the evening. Service will conclude Wednesday January 19, 2022 at 5:00pm. Please schedule your process accordingly.

The vendor will be here to service the 6300-stepper starting Thursday January 20, 2022 at 8am. The system should be available by 5pm the same day. Please schedule your process accordingly. Silva 09:14, 21 December 2021 (PST)

New COVID Protocols

All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.

Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.

This direction applies to all vaccinated and non-vaccinated persons. Outdoor policies remain unchanged.

See the full policies at COVID-19_User_Policies

// Hopkins a 08:14, 6 August 2021 (PDT)