Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(icp2 update)
(deleted wifi maint.)
(440 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
  +
'''''Equipment Status'''''
''UCSB NanoFab Announcements''
 
  +
----
 
<!--
 
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
'''How to add new news items'''
 
   
  +
In order for your post to show up correctly, you need to:
* Use level 5 heading for each item (5 equal signs) - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
 
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
  +
-->
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
  +
<!---------------------------------------------->
* "There are no announcements at this time." should be used when empty.
 
  +
<!------------- Equipment Status ---------------->
   
  +
===== GCA Autostep and 6300 October Maintenance =====
  +
The vendor will be here October 25 until October 28 to service both steppers. The Autostep will be Monday thru Wednesday from 8am until 6pm. The 6300 will be serviced on Thursday from 8am until 6pm.
  +
[[User:Silva|Silva]] 08:39, 12 October 2021 (PDT)
   
  +
===== Oxford ICP Installed =====
Example of a new post:
 
  +
A new ICP etcher for III-V etches (GaAs, InP, GaN) has been installed: [[Oxford_ICP_Etcher_(PlasmaPro_100_Cobra)]]
   
  +
Contact [[Tony_Bosch | the supervisor]] for training.
===== NanoFab making LN2 icecream =====
 
  +
// [[User:John d|John d]] 08:00, 30 September 2021 (PDT)
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
// ~~~~
 
   
  +
===== New COVID Protocols =====
  +
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
   
  +
This direction applies to all vaccinated and non-vaccinated persons.
(end of example)
 
The ~~~~ will be replaced with your username & timestamp after you submit the post.
 
   
  +
Outdoor policies remain unchanged
-->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
===== ICP#2 Up =====
 
RF travelling wave error unable to be reproduced, recipes appear to run fine.
 
// [[User:John d|John d]] 10:21, 2 April 2018 (PDT)
 
   
  +
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.
===== IBD is up =====
 
Power supply replaced, system is up.
 
// [[User:John d|John d]] 21:09, 28 March 2018 (PDT)
 
   
  +
See the full policies at [[COVID-19_User_Policies]]
===== ADT Dicing Saw: Intermittent Software Issue =====
 
One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it.
 
// [[User:John d|John d]] 21:43, 27 March 2018 (PDT)
 
   
  +
// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)
===== EBeam #4: Re-Training Required =====
 
The upgrade is complete and working well. All users will be required
 
to be trained again. The high voltage, sweep and turret controls are
 
all new.
 
// [[User:John d|John d]] 12:13, 26 March 2018 (PDT)
 
   
===== PECVD #2: UP with possible High Particulates =====
+
===== Weekly Testing strongly urged for UCSB Students/Staff =====
  +
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
We are still experiencing high particle counts in the Advanced Vacuum
 
PECVD process. Our next step is to replace the Silane MFC. I will
 
update you once I have a lead time on the new MFC. Most likely it will
 
take several weeks to receive. Until then, the system is operational
 
and can be used if your process is not sensitive to high particle
 
counts.
 
// [[User:John d|Posted:]] 13:22, 19 March 2018 (PDT)
 
   
  +
Weekly recurring appointments can be made at the Student Health website:
===== Gasonics: Up =====
 
  +
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned.
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
 
   
  +
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
===== Cary 500 Down =====
 
  +
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options.
 
// [[User:John d|Posted:]] 13:47, 12 February 2018 (PST)
 
   
  +
===== NanoFab COVID Protocols =====
<!---------- end of announcements ------------>
 
  +
  +
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
  +
  +
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
  +
  +
  +
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
  +
<!--------------------------------------------
  +
  +
  +
  +
  +
====== HOW TO ADD NEWS ITEMS ======
  +
  +
* You can copy/paste the example below for a new news item.
  +
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
  +
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
  +
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
  +
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
  +
* Please use "There are no announcements at this time." if the announcements are empty.
  +
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
  +
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
  +
  +
  +
******** EXAMPLE OF A NEW POST ********
  +
  +
===== NanoFab making LN2 icecream =====
  +
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// ~~~~
  +
  +
************* (end of example) **************
  +
The ~~~~ will be replaced with your username & timestamp after you submit the post.
  +
---------------------------------------------->

Revision as of 17:01, 21 October 2021

Equipment Status


GCA Autostep and 6300 October Maintenance

The vendor will be here October 25 until October 28 to service both steppers. The Autostep will be Monday thru Wednesday from 8am until 6pm. The 6300 will be serviced on Thursday from 8am until 6pm. Silva 08:39, 12 October 2021 (PDT)

Oxford ICP Installed

A new ICP etcher for III-V etches (GaAs, InP, GaN) has been installed: Oxford_ICP_Etcher_(PlasmaPro_100_Cobra)

Contact the supervisor for training. // John d 08:00, 30 September 2021 (PDT)

New COVID Protocols

All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.

This direction applies to all vaccinated and non-vaccinated persons.

Outdoor policies remain unchanged

Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.

See the full policies at COVID-19_User_Policies

// Hopkins a 08:14, 6 August 2021 (PDT)

Weekly Testing strongly urged for UCSB Students/Staff

Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.

Weekly recurring appointments can be made at the Student Health website:

The Chancellor's memo to campus with details can be found here. // John d 06:20, 16 November 2020 (PST)

NanoFab COVID Protocols

The most recent COVID Protocols can be found at COVID-19_User_Policies.

// John d 15:00, 19 July 2020 (PDT)