Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASMl PM)
(malformed rss XML - fixed hierachy)
(215 intermediate revisions by 4 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
''Equipment Status''
+
'''''Equipment Status'''''
  +
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
===== Lab is OPEN =====
 
Campus facilities finished the exhaust fan install sooner than expected. Cleanroom exhaust is up and running and the lab is safe to enter.
 
// [[User:John d|John d]] 09:37, 24 May 2019 (PDT)
 
   
===== Suss Bonder =====
+
===== GCA Autostep and 6300 October Maintenance =====
  +
The vendor will be here October 25 until October 28 to service both steppers. The Autostep will be Monday thru Wednesday from 8am until 6pm. The 6300 will be serviced on Thursday from 8am until 6pm.
Suss Bonder is DOWN. Suss field service is sourcing replacement parts for the bonder repair. An update will be sent out once we have a date scheduled for the service.
 
[[User:Silva|Silva]] 10:45, 12 April 2019 (PDT)
+
[[User:Silva|Silva]] 08:39, 12 October 2021 (PDT)
  +
  +
===== Oxford ICP Installed =====
  +
A new ICP etcher for III-V etches (GaAs, InP, GaN) has been installed: [[Oxford_ICP_Etcher_(PlasmaPro_100_Cobra)]]
  +
  +
Contact [[Tony_Bosch | the supervisor]] for training.
  +
// [[User:John d|John d]] 08:00, 30 September 2021 (PDT)
  +
 
===== New COVID Protocols =====
  +
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
  +
  +
This direction applies to all vaccinated and non-vaccinated persons.
  +
  +
Outdoor policies remain unchanged
  +
  +
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.
  +
  +
See the full policies at [[COVID-19_User_Policies]]
  +
  +
// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)
  +
  +
===== Weekly Testing strongly urged for UCSB Students/Staff =====
  +
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
  +
  +
Weekly recurring appointments can be made at the Student Health website:
  +
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
  +
  +
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
  +
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
   
===== SLR Fluorine ICP Etch =====
+
===== NanoFab COVID Protocols =====
The turbo upgrade has been postponed. I will update you once the new installation date has been established.
 
[[User:Silva|Silva]] 10:19, 28 May 2019 (PDT)
 
   
  +
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
===== GCA Autostep June Maintenance =====
 
The vendor will be working on the GCA Autostep 200 starting Monday June 10, 2019 at 9:00 am. Service will be complete Wednesday June 12, 2019 early evening. The system will be available in the evening during each day of service. Please plan your process accordingly.
 
[[User:Silva|Silva]] 10:24, 28 May 2019 (PDT)
 
   
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
===== GCA 6300 June Maintenance =====
 
The GCA 6300 will be serviced Thursday June 13, 2019 starting at 8:30 am. The service will be finished late afternoon. Please schedule your process accordingly.
 
[[User:Silva|Silva]] 10:24, 28 May 2019 (PDT)
 
   
===== ASML Stepper #3: Periodic Maintenance =====
 
ASML will be performing their quarterly maintenance on [[Stepper 3 (ASML DUV)|Stepper #3]] from Monday June 17th to Friday June 21st. Exact days may vary, we will email updates when we know exactly which days the tool will be closed.
 
// [[User:John d|John d]] 12:55, 28 May 2019 (PDT)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 17:34, 15 October 2021

Equipment Status


GCA Autostep and 6300 October Maintenance

The vendor will be here October 25 until October 28 to service both steppers. The Autostep will be Monday thru Wednesday from 8am until 6pm. The 6300 will be serviced on Thursday from 8am until 6pm. Silva 08:39, 12 October 2021 (PDT)

Oxford ICP Installed

A new ICP etcher for III-V etches (GaAs, InP, GaN) has been installed: Oxford_ICP_Etcher_(PlasmaPro_100_Cobra)

Contact the supervisor for training. // John d 08:00, 30 September 2021 (PDT)

New COVID Protocols

All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.

This direction applies to all vaccinated and non-vaccinated persons.

Outdoor policies remain unchanged

Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.

See the full policies at COVID-19_User_Policies

// Hopkins a 08:14, 6 August 2021 (PDT)

Weekly Testing strongly urged for UCSB Students/Staff

Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.

Weekly recurring appointments can be made at the Student Health website:

The Chancellor's memo to campus with details can be found here. // John d 06:20, 16 November 2020 (PST)

NanoFab COVID Protocols

The most recent COVID Protocols can be found at COVID-19_User_Policies.

// John d 15:00, 19 July 2020 (PDT)