Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted lab shutdown notice)
(added Pan2 & IBD)
Line 11: Line 11:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  +
  +
===== Panasonic ICP2: Down =====
  +
Turbo pump failed, please see email for updates.
  +
// [[User:John d|John d]] 00:54, 23 September 2020 (PDT)
  +
  +
===== Ion Beam Deposition: Down =====
  +
Load Lock turbo failed, please see email for updates.
  +
// [[User:John d|John d]] 00:54, 23 September 2020 (PDT)
   
 
===== NanoFab COVID Response =====
 
===== NanoFab COVID Response =====

Revision as of 00:54, 23 September 2020

Equipment Status


Panasonic ICP2: Down

Turbo pump failed, please see email for updates. // John d 00:54, 23 September 2020 (PDT)

Ion Beam Deposition: Down

Load Lock turbo failed, please see email for updates. // John d 00:54, 23 September 2020 (PDT)

NanoFab COVID Response

Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.

Contact the Lab Director for more information.

The most recent COVID Protocols can be found at COVID-19_User_Policies.

// John d 15:00, 19 July 2020 (PDT)

New Tool Installations

See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.

// John d 17:48, 2 June 2020 (PDT)

Unaxis ICP-PECVD

The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.

// Thibeault 14:22, 26 March 2020 (PDT)