Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (corrected date, COVID on top)
(23 intermediate revisions by 4 users not shown)
Line 6: Line 6:
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
  +
Please use FIVE equal-signs for the heading level. eg.: ===== my post =====
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
==== GCA 6000 March Maintenance ====
+
===== NanoFab COVID Response =====
  +
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
The GCA 6300 will be down for maintenance beginning 8:30am Monday March 9, 2020 until 6:30pm March 11, 2020.
 
  +
[[User:Silva|Silva]] 10:40, 10 February 2020 (PST)
 
  +
Contact the [[Brian Thibeault|Lab Director]] for more information.
   
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
==== GCA Autostep 200 March Maintenance ====
 
The Autostep 200 will be down for maintenance the morning of March 12, 2020 until late afternoon the same day.
 
[[User:Silva|Silva]] 10:40, 10 February 2020 (PST)
 
   
===== SignupMonkey Testing: Mon. Feb 17th, 7am =====
+
===== ASML Maintenance: Aug. 11-15th =====
  +
ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th.
We will be running tests on the SignupMonkey servers at 7am on Friday Feb. 17th (delayed from previous). This may cause temporary outages of the server at this time.
 
// [[User:John d|John d]] 10:52, 12 February 2020 (PST)
+
// [[User:John d|John d]] 14:50, 19 July 2020 (PDT)
   
===== N2 Dry Box Cleanout, February 14th =====
+
===== New Tool Installations =====
  +
See the [https://wiki.nanotech.ucsb.edu/w/index.php/Main_Page#mp-trivia-h2 News Feed] for info on two upcoming tool installations! We have a [https://www.raith.com/products/velion.html?mobile=0 Raith Velion FIB] and a [https://heidelberg-instruments.com/en/products/mla150.html Heidelberg MLA150 Maskless Aligner] on the way.
We will be cleaning out the large N2 dry box next to the ASML. Anything with a label that's older than 2 months will be removed. As a reminder, the dry box is for active processing only. If you would like to store anything in a N2 only environment for greater than two months please use the vacuum sealer (in bay 4). Please let me know if you have any questions or concerns.
 
[[User:Hopkins a|Hopkins a]] 16:07, 23 January 2020 (PST)
 
   
 
// [[User:John d|John d]] 17:48, 2 June 2020 (PDT)
===== ASML Maintenance: March 30th =====
 
ASML periodic maintenance will be on Monday March 30th, system will be down for up to 1.5 weeks.
 
// [[User:John d|John d]] 07:30, 27 January 2020 (PST)
 
   
 
===== Unaxis ICP-PECVD =====
 
===== Unaxis ICP-PECVD =====
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool.
+
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST)
 
   
 
// [[User:Thibeault|Thibeault]] 14:22, 26 March 2020 (PDT)
===== Suss Bonder =====
 
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options.
 
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 16:35, 19 July 2020

Equipment Status


NanoFab COVID Response

Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.

Contact the Lab Director for more information.

// John d 15:00, 19 July 2020 (PDT)

ASML Maintenance: Aug. 11-15th

ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th. // John d 14:50, 19 July 2020 (PDT)

New Tool Installations

See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.

// John d 17:48, 2 June 2020 (PDT)

Unaxis ICP-PECVD

The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.

// Thibeault 14:22, 26 March 2020 (PDT)