Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
m (corrected date, COVID on top) |
|||
(29 intermediate revisions by 4 users not shown) | |||
Line 6: | Line 6: | ||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | |||
+ | Please use FIVE equal-signs for the heading level. eg.: ===== my post ===== |
||
--> |
--> |
||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== NanoFab COVID Response ===== |
+ | Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time. |
||
− | We will be cleaning out the N2 dry box in bay 6. Anything with a label that's older than 2 months will be removed. As a reminder, the dry box is for active processing only. If you would like to store anything in a N2 only environment for greater than two months please use the vacuum sealer (in bay 4). Please let me know if you have any questions or concerns. |
||
+ | |||
⚫ | |||
+ | Contact the [[Brian Thibeault|Lab Director]] for more information. |
||
+ | |||
⚫ | |||
+ | |||
⚫ | |||
+ | ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th. |
||
⚫ | |||
+ | |||
+ | ===== New Tool Installations ===== |
||
+ | See the [https://wiki.nanotech.ucsb.edu/w/index.php/Main_Page#mp-trivia-h2 News Feed] for info on two upcoming tool installations! We have a [https://www.raith.com/products/velion.html?mobile=0 Raith Velion FIB] and a [https://heidelberg-instruments.com/en/products/mla150.html Heidelberg MLA150 Maskless Aligner] on the way. |
||
⚫ | |||
⚫ | |||
− | Accommodating user requests, we have moved the periodic maintenance to Monday March 30th. The PM will still be on the order of 1.5 weeks at that time. Please let me know if you have any questions or see any calibration drifts in the mean time. |
||
⚫ | |||
===== Unaxis ICP-PECVD ===== |
===== Unaxis ICP-PECVD ===== |
||
− | The ICP-PECVD module is |
+ | The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only. |
− | [[User:Silva|Silva]] 15:04, 19 November 2019 (PST) |
||
+ | // [[User:Thibeault|Thibeault]] 14:22, 26 March 2020 (PDT) |
||
− | ===== Suss Bonder ===== |
||
− | Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. |
||
⚫ | |||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 16:35, 19 July 2020
Equipment Status
NanoFab COVID Response
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
Contact the Lab Director for more information.
// John d 15:00, 19 July 2020 (PDT)
ASML Maintenance: Aug. 11-15th
ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th. // John d 14:50, 19 July 2020 (PDT)
New Tool Installations
See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.
// John d 17:48, 2 June 2020 (PDT)
Unaxis ICP-PECVD
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.
// Thibeault 14:22, 26 March 2020 (PDT)