Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (corrected date, COVID on top)
(31 intermediate revisions by 4 users not shown)
Line 6: Line 6:
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
  +
Please use FIVE equal-signs for the heading level. eg.: ===== my post =====
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== GCA 6300 Maintenance =====
+
===== NanoFab COVID Response =====
  +
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
The system will be down for service Thursday January 23, 2020 until late afternoon.
 
  +
[[User:Silva|Silva]] 08:15, 16 January 2020 (PST)
 
  +
Contact the [[Brian Thibeault|Lab Director]] for more information.
  +
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
  +
 
===== ASML Maintenance: Aug. 11-15th =====
  +
ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th.
 
// [[User:John d|John d]] 14:50, 19 July 2020 (PDT)
  +
  +
===== New Tool Installations =====
  +
See the [https://wiki.nanotech.ucsb.edu/w/index.php/Main_Page#mp-trivia-h2 News Feed] for info on two upcoming tool installations! We have a [https://www.raith.com/products/velion.html?mobile=0 Raith Velion FIB] and a [https://heidelberg-instruments.com/en/products/mla150.html Heidelberg MLA150 Maskless Aligner] on the way.
   
 
// [[User:John d|John d]] 17:48, 2 June 2020 (PDT)
===== MOVED: ASML Maintenance: March 30th =====
 
Accommodating user requests, we have moved the periodic maintenance to Monday March 30th. The PM will still be on the order of 1.5 weeks at that time. Please let me know if you have any questions or see any calibration drifts in the mean time.
 
// [[User:John d|John d]] 16:25, 16 January 2020 (PST)
 
   
 
===== Unaxis ICP-PECVD =====
 
===== Unaxis ICP-PECVD =====
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool.
+
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST)
 
   
  +
// [[User:Thibeault|Thibeault]] 14:22, 26 March 2020 (PDT)
===== Suss Bonder =====
 
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options.
 
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 16:35, 19 July 2020

Equipment Status


NanoFab COVID Response

Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.

Contact the Lab Director for more information.

// John d 15:00, 19 July 2020 (PDT)

ASML Maintenance: Aug. 11-15th

ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th. // John d 14:50, 19 July 2020 (PDT)

New Tool Installations

See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.

// John d 17:48, 2 June 2020 (PDT)

Unaxis ICP-PECVD

The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.

// Thibeault 14:22, 26 March 2020 (PDT)