Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (deleted SUM testing)
(bumped COVID closure post, link to BThibeault page)
(6 intermediate revisions by 3 users not shown)
Line 13: Line 13:
   
   
===== GCA 6000 March Maintenance =====
+
===== NanoFab Closure =====
  +
Following guidelines provided by our Office of Research, we will be closing the UCSB Nanofabrication Facility for regular use, effective Tuesday, March 17 at 5pm.
The GCA 6300 will be down for maintenance beginning 8:30am Monday March 9, 2020 until 6:30pm March 11, 2020.
 
[[User:Silva|Silva]] 10:40, 10 February 2020 (PST)
 
   
  +
On a limited basis, our Facility can consider access to users to perform “critical activities.”
===== GCA Autostep 200 March Maintenance =====
 
The Autostep 200 will be down for maintenance the morning of March 12, 2020 until late afternoon the same day.
 
[[User:Silva|Silva]] 10:40, 10 February 2020 (PST)
 
   
  +
Please see email for complete details, titled "Closure of Nanofab to implement University Ramp Down Policy" sent on Tue, Mar 17, 2020 at 9:24 AM PDT. Contact the [[Brian Thibeault|Lab Director]] for more information.
===== ASML Maintenance: March 30th =====
 
 
// [[User:John d|John d]] 11:42, 01 April 2020 (PDT)
ASML Stepper #3 periodic maintenance will be on Monday March 30th, system will be down for up to 1.5 weeks.
 
// [[User:John d|John d]] 07:30, 27 January 2020 (PST)
 
   
===== Unaxis ICP-PECVD =====
 
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool.
 
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST)
 
   
  +
===== Suss Bonder =====
 
 
===== ASML Maintenance cancelled =====
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options.
 
  +
Cancelled until further notice
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT)
 
 
// [[User:Thibeault|Thibeault]] 14:20, 26 March 2020 (PDT)
  +
 
===== Unaxis ICP-PECVD =====
  +
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.
  +
//[[User:Thibeault|Thibeault]] 14:22, 26 March 2020 (PDT)
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 08:50, 29 April 2020

Equipment Status



NanoFab Closure

Following guidelines provided by our Office of Research, we will be closing the UCSB Nanofabrication Facility for regular use, effective Tuesday, March 17 at 5pm.

On a limited basis, our Facility can consider access to users to perform “critical activities.”

Please see email for complete details, titled "Closure of Nanofab to implement University Ramp Down Policy" sent on Tue, Mar 17, 2020 at 9:24 AM PDT. Contact the Lab Director for more information. // John d 11:42, 01 April 2020 (PDT)


ASML Maintenance cancelled

Cancelled until further notice // Thibeault 14:20, 26 March 2020 (PDT)

Unaxis ICP-PECVD

The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only. //Thibeault 14:22, 26 March 2020 (PDT)