Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(asml PM moved)
(bumped COVID closure post, link to BThibeault page)
(20 intermediate revisions by 4 users not shown)
Line 6: Line 6:
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
  +
Please use FIVE equal-signs for the heading level. eg.: ===== my post =====
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== GCA Autosetp Maintenance =====
 
The system will be down for service Monday January 20, 2020 until late afternoon Wednesday January 22nd.
 
[[User:Silva|Silva]] 08:14, 16 January 2020 (PST)
 
   
===== GCA 6300 Maintenance =====
+
===== NanoFab Closure =====
  +
Following guidelines provided by our Office of Research, we will be closing the UCSB Nanofabrication Facility for regular use, effective Tuesday, March 17 at 5pm.
The system will be down for service Thursday January 23, 2020 until late afternoon.
 
[[User:Silva|Silva]] 08:15, 16 January 2020 (PST)
 
   
  +
On a limited basis, our Facility can consider access to users to perform “critical activities.”
===== MOVED: ASML Maintenance: March 30th =====
 
Accommodating user requests, we have moved the periodic maintenance to Monday March 30th. The PM will still be on the order of 1.5 weeks at that time. Please let me know if you have any questions or see any calibration drifts in the mean time.
 
// [[User:John d|John d]] 16:25, 16 January 2020 (PST)
 
   
  +
Please see email for complete details, titled "Closure of Nanofab to implement University Ramp Down Policy" sent on Tue, Mar 17, 2020 at 9:24 AM PDT. Contact the [[Brian Thibeault|Lab Director]] for more information.
===== Unaxis ICP-PECVD =====
 
 
// [[User:John d|John d]] 11:42, 01 April 2020 (PDT)
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool.
 
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST)
 
   
  +
===== Suss Bonder =====
 
  +
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options.
 
 
===== ASML Maintenance cancelled =====
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT)
 
  +
Cancelled until further notice
 
// [[User:Thibeault|Thibeault]] 14:20, 26 March 2020 (PDT)
  +
 
===== Unaxis ICP-PECVD =====
  +
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.
  +
//[[User:Thibeault|Thibeault]] 14:22, 26 March 2020 (PDT)
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 08:50, 29 April 2020

Equipment Status



NanoFab Closure

Following guidelines provided by our Office of Research, we will be closing the UCSB Nanofabrication Facility for regular use, effective Tuesday, March 17 at 5pm.

On a limited basis, our Facility can consider access to users to perform “critical activities.”

Please see email for complete details, titled "Closure of Nanofab to implement University Ramp Down Policy" sent on Tue, Mar 17, 2020 at 9:24 AM PDT. Contact the Lab Director for more information. // John d 11:42, 01 April 2020 (PDT)


ASML Maintenance cancelled

Cancelled until further notice // Thibeault 14:20, 26 March 2020 (PDT)

Unaxis ICP-PECVD

The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only. //Thibeault 14:22, 26 March 2020 (PDT)