Difference between revisions of "Template:Announcements"
(bumped COVID closure post, link to BThibeault page) |
|||
(22 intermediate revisions by 4 users not shown) | |||
Line 6: | Line 6: | ||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | |||
+ | Please use FIVE equal-signs for the heading level. eg.: ===== my post ===== |
||
--> |
--> |
||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== GCA Autosetp Maintenance ===== |
||
− | The system will be down for service Monday January 20, 2020 until late afternoon Wednesday January 22nd. |
||
⚫ | |||
− | ===== |
+ | ===== NanoFab Closure ===== |
+ | Following guidelines provided by our Office of Research, we will be closing the UCSB Nanofabrication Facility for regular use, effective Tuesday, March 17 at 5pm. |
||
− | Laser Gas Fill enabled. System calibrated, ready for use. |
||
⚫ | |||
+ | On a limited basis, our Facility can consider access to users to perform “critical activities.” |
||
⚫ | |||
− | System will be unavailable from Monday Feb 10th to Wednesday Feb 19th. |
||
− | May be able to open up the system earlier depending on how the work goes. |
||
⚫ | |||
+ | Please see email for complete details, titled "Closure of Nanofab to implement University Ramp Down Policy" sent on Tue, Mar 17, 2020 at 9:24 AM PDT. Contact the [[Brian Thibeault|Lab Director]] for more information. |
||
⚫ | |||
⚫ | |||
− | The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. |
||
− | [[User:Silva|Silva]] 15:04, 19 November 2019 (PST) |
||
+ | |||
− | ===== Suss Bonder ===== |
||
+ | |||
− | Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. |
||
⚫ | |||
− | [[User:Silva|Silva]] 11:16, 25 October 2019 (PDT) |
||
+ | Cancelled until further notice |
||
⚫ | |||
+ | |||
⚫ | |||
+ | The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only. |
||
⚫ | |||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 08:50, 29 April 2020
Equipment Status
NanoFab Closure
Following guidelines provided by our Office of Research, we will be closing the UCSB Nanofabrication Facility for regular use, effective Tuesday, March 17 at 5pm.
On a limited basis, our Facility can consider access to users to perform “critical activities.”
Please see email for complete details, titled "Closure of Nanofab to implement University Ramp Down Policy" sent on Tue, Mar 17, 2020 at 9:24 AM PDT. Contact the Lab Director for more information. // John d 11:42, 01 April 2020 (PDT)
ASML Maintenance cancelled
Cancelled until further notice // Thibeault 14:20, 26 March 2020 (PDT)
Unaxis ICP-PECVD
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only. //Thibeault 14:22, 26 March 2020 (PDT)