===== ASML is DOWN: Repair Expected Monday =====
 
===== ASML is DOWN: Repair Expected Monday =====
Level sensor failed. May require hardware replacement for lamp housing, will likely get an ASML technician on site on Monday Jan 6th.
+
Parts on order for Level Sensor lamp assembly replacement, will likely get an ASML technician on site on Monday Jan 6th.
// [[User:John d|John d]] 12:33, 2 January 2020 (PST)
+
// [[User:John d|John d]] 14:14, 2 January 2020 (PST)
   
 
===== Unaxis ICP-PECVD =====
 
===== Unaxis ICP-PECVD =====

Revision as of 15:14, 2 January 2020

Equipment Status


ASML is DOWN: Repair Expected Monday

Parts on order for Level Sensor lamp assembly replacement, will likely get an ASML technician on site on Monday Jan 6th. // John d 14:14, 2 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)