Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (Undo revision 157023 by John d (talk))
Tag: Undo
(removed CR=OPEN, ASML update)
Line 9: Line 9:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
 
===== Nanofab is OPEN =====
 
The cleanroom is now open.
 
// [[User:John d|John d]] 08:50, 28 December 2019 (PST)
 
   
 
===== ASML is DOWN =====
 
===== ASML is DOWN =====
Level sensor failed. ASML support staff is unavailable until Jan 2nd due to vacations. Will work on it as soon as we get info from ASML.
+
Level sensor failed. May require hardware replacement for lamp housing, will likely get an ASML technician on site on Monday Jan 6th.
// [[User:John d|John d]] 10:54, 30 December 2019 (PST)
+
// [[User:John d|John d]] 12:33, 2 January 2020 (PST)
   
 
===== Unaxis ICP-PECVD =====
 
===== Unaxis ICP-PECVD =====

Revision as of 13:33, 2 January 2020

Equipment Status


ASML is DOWN

Level sensor failed. May require hardware replacement for lamp housing, will likely get an ASML technician on site on Monday Jan 6th. // John d 12:33, 2 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)