Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(nanofab open, asml down)
(→‎ASML is DOWN: light bulb update)
Line 15: Line 15:
   
 
===== ASML is DOWN =====
 
===== ASML is DOWN =====
One of the subsystems won't initialize. ASML support staff is unavailable due to vacations. Will work on it next week.
+
Level sensor failed, suspect it is just a halogen light bulb. ASML support staff is unavailable until Jan 2nd due to vacations. Will work on it as soon as we get the procedure from ASML.
// [[User:John d|John d]] 08:50, 28 December 2019 (PST)
+
// [[User:John d|John d]] 10:01, 30 December 2019 (PST)
   
 
===== Unaxis ICP-PECVD =====
 
===== Unaxis ICP-PECVD =====

Revision as of 11:01, 30 December 2019

Equipment Status


Nanofab is OPEN

The cleanroom is now open. // John d 08:50, 28 December 2019 (PST)

ASML is DOWN

Level sensor failed, suspect it is just a halogen light bulb. ASML support staff is unavailable until Jan 2nd due to vacations. Will work on it as soon as we get the procedure from ASML. // John d 10:01, 30 December 2019 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)