Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 9: Line 9:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
  +
  +
===== Nanofab Yearly Shutdown =====
  +
The cleanroom will be closed from 12/25/19 at noon until 12/27/19 at 5pm for our yearly maintenance. No one will be allowed inside the lab during this time. An email will be sent out once the cleanroom is safe to enter. Please plan accordingly.
  +
[[User:Hopkins a|Hopkins a]] 15:30, 9 December 2019 (PST)
   
 
===== Unaxis ICP-PECVD =====
 
===== Unaxis ICP-PECVD =====

Revision as of 16:30, 9 December 2019

Equipment Status


Nanofab Yearly Shutdown

The cleanroom will be closed from 12/25/19 at noon until 12/27/19 at 5pm for our yearly maintenance. No one will be allowed inside the lab during this time. An email will be sent out once the cleanroom is safe to enter. Please plan accordingly. Hopkins a 15:30, 9 December 2019 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)