Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(added logitech bonder)
Line 8: Line 8:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  +
  +
===== Logitech Wafer Bonder: Down =====
  +
There's an issue with the external transformer, awaiting replacement parts for the repair.
  +
// [[User:John d|John d]] 13:51, 20 August 2019 (PDT)
   
 
===== Suss Bonder =====
 
===== Suss Bonder =====

Revision as of 13:51, 20 August 2019

Equipment Status

Logitech Wafer Bonder: Down

There's an issue with the external transformer, awaiting replacement parts for the repair. // John d 13:51, 20 August 2019 (PDT)

Suss Bonder

Suss Bonder is DOWN. Suss field service is sourcing replacement parts for the bonder repair. An update will be sent out once we have a date scheduled for the service. Silva 10:45, 12 April 2019 (PDT)

E-Beam#2

E-Beam#2 will be down July 29, 2019 until August 16, 2019 for the EBC and power supply upgrade. Silva 12:44, 21 July 2019 (PDT)