Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 16: Line 16:
 
The system is down. The E-Beam#1 power supply and control upgrade started today. We hope to complete the process within 10 business days. We will keep you posted as progress is made.
 
The system is down. The E-Beam#1 power supply and control upgrade started today. We hope to complete the process within 10 business days. We will keep you posted as progress is made.
 
// [[User:Silva|Silva]] 21:45, 11 February 2019 (PST)
 
// [[User:Silva|Silva]] 21:45, 11 February 2019 (PST)
 
===== ICP Panasonic#1 =====
 
The system is down. There is a lost wafer in the process chamber. Don will address the issue on Monday.
 
[[User:Silva|Silva]] 20:57, 23 February 2019 (PST)
 
   
 
===== ASML DUV: PM March 12 to 15th =====
 
===== ASML DUV: PM March 12 to 15th =====

Revision as of 11:53, 25 February 2019

Equipment Status

Suss Bonder

Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions. // Silva 21:36, 13 February 2019 (PST)

E-Beam#1

The system is down. The E-Beam#1 power supply and control upgrade started today. We hope to complete the process within 10 business days. We will keep you posted as progress is made. // Silva 21:45, 11 February 2019 (PST)

ASML DUV: PM March 12 to 15th

ASML will be performing their periodic maintenance on the DUV stepper from Tuesday March 12th through Friday March 15th. Please schedule your work accordingly. // John d 11:02, 15 February 2019 (PST)