Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 17: Line 17:
 
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST)
 
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST)
   
===== ALD Metal Dep. =====
+
===== ALD Metal Dep =====
The system is down. A new turbo pump will be delivered in three weeks.
+
The system is down. The lead time for the replacement turbo pump is three weeks.
[[User:Silva|Silva]] 10:41, 4 February 2019 (PST)
+
[[User:Silva|Silva]] 10:44, 4 February 2019 (PST)
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 11:44, 4 February 2019

Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)

ALD Metal Dep

The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)