Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 16: Line 16:
 
The system is down. We are sourcing a replacement PCB.
 
The system is down. We are sourcing a replacement PCB.
 
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST)
 
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST)
  +
  +
===== ALD Metal Dep.
  +
The system is down. A new turbo pump will be delivered in three weeks.
  +
[[User:Silva|Silva]] 10:41, 4 February 2019 (PST)
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 11:41, 4 February 2019

Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)

===== ALD Metal Dep. The system is down. A new turbo pump will be delivered in three weeks. Silva 10:41, 4 February 2019 (PST)