Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(email issue, asml update)
(deleted email/google issue)
Line 8: Line 8:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
<!------------- Announcements ---------------->
 
===== NanoFab Emails Unavailable =====
 
Due to an upstream connectivity issue with Google servers, NanoFab Staff emails are currently unavailable.
 
Please call the appropriate phone for assistance: [[Staff_List|Contacts on Staff List]]
 
// [[User:John d|John d]] 10:55, 18 December 2018 (PST)
 
 
 
===== ASML Stepper: Down =====
 
===== ASML Stepper: Down =====
 
We have identified an issue with the Wafer Stage X-Direction Stator. It is currently under repair.
 
We have identified an issue with the Wafer Stage X-Direction Stator. It is currently under repair.

Revision as of 16:10, 18 December 2018

UCSB NanoFab Announcements

ASML Stepper: Down

We have identified an issue with the Wafer Stage X-Direction Stator. It is currently under repair. // John d 10:55, 18 December 2018 (PST)

Lab Shutdown: Dec 27 + 28

We will be having our yearly lab shutdown on *Thursday, December 27th and Friday, December 28th* to sanitize our DI water system and for general fab maintenance. We will send out an email Friday afternoon when the lab is ready to use. // John d 15:21, 12 December 2018 (PST)

New Filmetrics Systems

A Filmetrics F10-RT for optical reflection/transmission spectra, and a Filmetrics F50 thin-film wafer-mapping system have been installed. Trainings will be announced once operating procedures have been developed. Contact Ning Cao for more info. // John d 15:21, 12 December 2018 (PST)