Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(DUV scope update)
(ibd update)
Line 8: Line 8:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
<!------------- Announcements ---------------->
  +
 
===== IBD Up =====
  +
The IBD has been recovered and is ready for use.
 
//[[User:John d|John d]] 00:36, 1 September 2018 (PDT)
  +
   
 
===== Deep-UV uScope Operational =====
 
===== Deep-UV uScope Operational =====
Line 15: Line 20:
 
===== GCA 6300 Maintenance =====
 
===== GCA 6300 Maintenance =====
 
The GCA 6300 will be down 09/12/18 thru 09/13/18 from 8:00 am until 6:30 pm both days for service. The system will be available for your use both days after 6:30 pm. Please schedule your process accordingly.
 
The GCA 6300 will be down 09/12/18 thru 09/13/18 from 8:00 am until 6:30 pm both days for service. The system will be available for your use both days after 6:30 pm. Please schedule your process accordingly.
// [[User:John d|John d]] 15:19, 29 August 2018 (PDT)
 
 
===== IBD Down =====
 
The 8/27 power outage has damaged something in the communications network.
 
 
// [[User:John d|John d]] 15:19, 29 August 2018 (PDT)
 
// [[User:John d|John d]] 15:19, 29 August 2018 (PDT)
   

Revision as of 00:36, 1 September 2018

UCSB NanoFab Announcements

IBD Up

The IBD has been recovered and is ready for use. //John d 00:36, 1 September 2018 (PDT)


Deep-UV uScope Operational

The DUV Microscope is now repaired and operational. // John d 23:49, 30 August 2018 (PDT)

GCA 6300 Maintenance

The GCA 6300 will be down 09/12/18 thru 09/13/18 from 8:00 am until 6:30 pm both days for service. The system will be available for your use both days after 6:30 pm. Please schedule your process accordingly. // John d 15:19, 29 August 2018 (PDT)

Ebeam#2: System UP

System up. Heater is back on-line. Read email carefully about new policies for use. Thibeault 17:06, 21 August 2018 (PDT)

PECVD#1: Software Upgrade

Plasmatherm will be upgrading the system software on September 17th. The upgrade will take 3-5 days. After the upgrade is complete, everyone must be re-certified to use the tool. Please document any custom recipes that you may have, in case they can't be copied over. // John d 06:38, 15 August 2018 (PDT)

RIE#5: SiCl4 Issue

We have a flow rate problem on the SiCl4 gas line. You can only flow the SiCl4 for 5 minutes and then you have to wait 5 minutes before you flow it again. So in order to to do a 10 minute Etch you will have to do it in three steps flow 5 mi, wait 5mi, then flow 5min. // John d 17:22, 15 June 2018 (PDT)