Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted old messaged, updated PECVD2)
(stepper 2 down, deleted >1 week old annc.)
Line 8: Line 8:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
<!------------- Announcements ---------------->
===== JEOL SEM #2: Up =====
+
===== Stepper #2: Down until Mon Morning =====
  +
It's been reported that the load arm is malfunctioning and recovery
The transfer rod has been replaced. Please be sure to insert the rod
 
  +
steps are not working. I will take a look at the tool Monday morning.
slowly and carefully to ensure it doesn't get damaged again. If any
 
  +
The system is down until further notice.
resistance, rotate left and right while maintaining forward pressure
 
 
// [[User:John d|John d]] 19:23, 12 May 2018 (PDT)
and it will smoothly work through the o-rings.
 
// [[User:John d|John d]] 15:02, 30 April 2018 (PDT)
 
 
===== RIE#5 Up, SiCl4 now available =====
 
SiCl4 is available for use. We tried a new line heater on the SiCl4 and that seemed to do the trick. The system is still pumping slow but is getting better.
 
// [[User:John d|John d]] 15:00, 27 April 2018 (PDT)
 
   
 
===== PECVD#2: Open Soon =====
 
===== PECVD#2: Open Soon =====

Revision as of 19:23, 12 May 2018

UCSB NanoFab Announcements

Stepper #2: Down until Mon Morning

It's been reported that the load arm is malfunctioning and recovery steps are not working. I will take a look at the tool Monday morning. The system is down until further notice. // John d 19:23, 12 May 2018 (PDT)

PECVD#2: Open Soon

The Plasma Therm Cortex software update is complete, and the system is operational. Standard recipes requalified. Particle counts are now much lower and around historical levels. Software has a few issues being worked out. Training will be announced soon. // Thibeault 16:37, 10 May 2018 (PDT)